{"id":25605603,"date":"2025-03-12T15:23:06","date_gmt":"2025-03-12T09:53:06","guid":{"rendered":"https:\/\/entri.app\/blog\/?p=25605603"},"modified":"2025-03-13T16:00:38","modified_gmt":"2025-03-13T10:30:38","slug":"rrb-technician-grade-1-cut-off","status":"publish","type":"post","link":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/","title":{"rendered":"RRB Technician Grade 1 Cut Off 2025 &#8211; Zone Wise"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_79_2 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<label for=\"ez-toc-cssicon-toggle-item-69ea64695259f\" class=\"ez-toc-cssicon-toggle-label\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/label><input type=\"checkbox\"  id=\"ez-toc-cssicon-toggle-item-69ea64695259f\"  aria-label=\"Toggle\" \/><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#Railway_RRB_Technician_Grade_1_Recruitment_2025_Highlights\" >Railway RRB Technician Grade 1 Recruitment 2025 Highlights<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#RRB_Technician_Grade_1_Result_2025_PDF\" >RRB Technician Grade 1 Result 2025 PDF<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#Railway_RRB_Technician_Grade_1_Cut_Off_2025_PDF_%E2%80%93_Zone_Wise\" >Railway RRB Technician Grade 1 Cut Off 2025 PDF &#8211; Zone Wise<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#Railway_RRB_Technician_Grade_1_2025_Cut_Off_%E2%80%93_Direct_Link\" >Railway RRB Technician Grade 1 2025 Cut Off &#8211; Direct Link<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#RRB_Technician_Grade_1_2025_Cut_Off_%E2%80%93_Zone_Wise_List\" >RRB Technician Grade 1 2025 Cut Off \u2013 Zone Wise List<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#Step_to_Check_RRB_Technician_Grade_1_Cut_Off_2025\" >Step to Check RRB Technician Grade 1 Cut Off 2025<\/a><\/li><\/ul><\/nav><\/div>\n<p>The RRB Technician Grade 1 Result 2025 has been released, and candidates who appeared for the exam held from 19th to 20th December 2024 can now check their results. Along with the results, the RRB Technician Grade 1 Cut Off 2025 is also available, specifying the minimum qualifying marks required for each category. The cut-off marks vary by zone and category, and in this blog, we will provide a detailed breakdown of the zone-wise cut-offs for all categories to help candidates understand their performance and eligibility for the next stage.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Railway_RRB_Technician_Grade_1_Recruitment_2025_Highlights\"><\/span><strong>Railway RRB Technician Grade 1 Recruitment 2025 Highlights<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table data-start=\"74\" data-end=\"993\">\n<thead data-start=\"74\" data-end=\"145\">\n<tr data-start=\"74\" data-end=\"145\">\n<th data-start=\"74\" data-end=\"103\">Details<\/th>\n<th data-start=\"103\" data-end=\"145\">Event<\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"218\" data-end=\"993\">\n<tr data-start=\"218\" data-end=\"288\">\n<td><strong data-start=\"220\" data-end=\"229\">Organization<\/strong><\/td>\n<td>Railway Recruitment Board (RRB)<\/td>\n<\/tr>\n<tr data-start=\"218\" data-end=\"288\">\n<td><strong data-start=\"220\" data-end=\"229\">Posts<\/strong><\/td>\n<td>Technician Grade 1 and Grade 3<\/td>\n<\/tr>\n<tr data-start=\"289\" data-end=\"360\">\n<td><strong data-start=\"291\" data-end=\"304\">Vacancies<\/strong><\/td>\n<td>14,298<\/td>\n<\/tr>\n<tr data-start=\"361\" data-end=\"432\">\n<td><strong data-start=\"363\" data-end=\"375\">Category<\/strong><\/td>\n<td>Result<\/td>\n<\/tr>\n<tr data-start=\"433\" data-end=\"504\">\n<td><strong data-start=\"435\" data-end=\"445\">Status<\/strong><\/td>\n<td>Released<\/td>\n<\/tr>\n<tr data-start=\"505\" data-end=\"576\">\n<td><strong data-start=\"507\" data-end=\"535\">RRB Technician Exam Date<\/strong><\/td>\n<td>Grade 1: 19th, 20th December 2024<\/td>\n<\/tr>\n<tr data-start=\"577\" data-end=\"677\">\n<td><\/td>\n<td>Grade 3: 23rd, 24th, 26th, 27th, 28th, 29th, and 30th December 2024<\/td>\n<\/tr>\n<tr data-start=\"678\" data-end=\"752\">\n<td><strong data-start=\"680\" data-end=\"710\">RRB Technician Result 2025<\/strong><\/td>\n<td>12th March 2025<\/td>\n<\/tr>\n<tr data-start=\"753\" data-end=\"824\">\n<td><strong data-start=\"755\" data-end=\"777\">Candidates Applied<\/strong><\/td>\n<td>22,83,812<\/td>\n<\/tr>\n<tr data-start=\"825\" data-end=\"905\">\n<td><strong data-start=\"827\" data-end=\"848\">Selection Process<\/strong><\/td>\n<td>CBT, Document Verification, Medical Examination<\/td>\n<\/tr>\n<tr data-start=\"906\" data-end=\"993\">\n<td><strong data-start=\"908\" data-end=\"928\">Official Website<\/strong><\/td>\n<td><a href=\"https:\/\/www.rrbcdg.gov.in\" target=\"_new\" rel=\"noopener\" data-start=\"937\" data-end=\"991\">https:\/\/www.rrbcdg.gov.in<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Technician_Grade_1_Result_2025_PDF\"><\/span><strong data-start=\"32\" data-end=\"68\">RRB Technician Grade 1 Result 2025 PDF<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Candidates who appeared for the RRB Technician Grade 1 Exam 2025 can now check their results by downloading the official result PDF. The PDF contains the list of candidates who have qualified for the next phase of the recruitment process. To access the result, simply click on the link below, download the PDF, and verify your name or roll number. Make sure to save the result for future reference.<\/p>\n<p style=\"text-align: center;\"><a class=\"btn btn-default\" href=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-result\/\" target=\"_blank\" rel=\"noopener\">GET RRB TECH GR 1 RESULT PDF<\/a><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Railway_RRB_Technician_Grade_1_Cut_Off_2025_PDF_%E2%80%93_Zone_Wise\"><\/span><strong>Railway RRB Technician Grade 1 Cut Off 2025 PDF &#8211; Zone Wise<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Those who appeared for the RRB Technician Grade 1 Exam 2025 can now access the zone-wise cut-off marks for each category. The cut-off PDF contains the minimum qualifying marks required for different zones and categories, helping candidates understand their eligibility for the next stages of the recruitment process.<\/p>\n<p>To view the detailed cut-off marks, click the link below to download the zone-wise cut-off PDF and check the specific marks for your zone and category.<\/p>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"112\" data-end=\"2113\">\n<thead data-start=\"112\" data-end=\"199\">\n<tr data-start=\"112\" data-end=\"199\">\n<th data-start=\"112\" data-end=\"135\"><strong data-start=\"114\" data-end=\"123\">Zones<\/strong><\/th>\n<th data-start=\"135\" data-end=\"171\"><strong data-start=\"137\" data-end=\"170\">RRB Technician Grade 1 Result<\/strong><\/th>\n<th data-start=\"171\" data-end=\"199\"><strong data-start=\"173\" data-end=\"197\">Candidates Qualified<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"287\" data-end=\"2113\">\n<tr data-start=\"287\" data-end=\"373\">\n<td>Ranchi<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Technician-Result-2025-RANCHI.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Technician-Result-2025-RANCHI.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>29<\/td>\n<\/tr>\n<tr data-start=\"374\" data-end=\"460\">\n<td>Bilaspur<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Tech-G-I-Result-Publishing-BILSAPUR.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Tech-G-I-Result-Publishing-BILSAPUR.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>95<\/td>\n<\/tr>\n<tr data-start=\"461\" data-end=\"547\">\n<td>Chennai<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Chennai-Technician.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Chennai-Technician.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>48<\/td>\n<\/tr>\n<tr data-start=\"548\" data-end=\"634\">\n<td>Gorakhpur<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Tech-1-RORAKHAPUR.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Tech-1-RORAKHAPUR.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>59<\/td>\n<\/tr>\n<tr data-start=\"635\" data-end=\"721\">\n<td>Ahmedabad<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Ahmedabad.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Ahmedabad.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>74<\/td>\n<\/tr>\n<tr data-start=\"722\" data-end=\"808\">\n<td>Bangalore<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Technician-Banglore-.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Technician-Banglore-.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>44<\/td>\n<\/tr>\n<tr data-start=\"809\" data-end=\"895\">\n<td>Allahabad<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Technician-Allahabad-.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/RRB-Technician-Allahabad-.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>131<\/td>\n<\/tr>\n<tr data-start=\"896\" data-end=\"982\">\n<td>Chandigarh<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Tech-1_CBT_RESULT-chandigarh.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Tech-1_CBT_RESULT-chandigarh.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>25<\/td>\n<\/tr>\n<tr data-start=\"983\" data-end=\"1069\">\n<td>Bhopal<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/BHOPAL_PublishingReport_12Mar2025-Data.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/BHOPAL_PublishingReport_12Mar2025-Data.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>79<\/td>\n<\/tr>\n<tr data-start=\"1070\" data-end=\"1156\">\n<td>Bhubaneswar<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Bhuveneshar-G-1.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Bhuveneshar-G-1.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>12<\/td>\n<\/tr>\n<tr data-start=\"1157\" data-end=\"1243\">\n<td>Bilaspur<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Bilaspur-G-1.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Bilaspur-G-1.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>95<\/td>\n<\/tr>\n<tr data-start=\"1244\" data-end=\"1330\">\n<td>Jammu-Srinagar<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"1331\" data-end=\"1417\">\n<td>Guwahati<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Bilaspur-G-1.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Bilaspur-G-1.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>16<\/td>\n<\/tr>\n<tr data-start=\"1418\" data-end=\"1504\">\n<td>Kolkata<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/KOLKATA_G-1.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/KOLKATA_G-1.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>74<\/td>\n<\/tr>\n<tr data-start=\"1505\" data-end=\"1591\">\n<td>Mumbai<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/mumbai.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/mumbai.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>152<\/td>\n<\/tr>\n<tr data-start=\"1592\" data-end=\"1678\">\n<td>Muzaffarpur<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/muzaffarpur.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/muzaffarpur.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>08<\/td>\n<\/tr>\n<tr data-start=\"1679\" data-end=\"1765\">\n<td>Malda<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/MALDA-G1.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/MALDA-G1.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>17<\/td>\n<\/tr>\n<tr data-start=\"1766\" data-end=\"1852\">\n<td>Patna<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/dv-result-tech-I-PATNA.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/dv-result-tech-I-PATNA.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>01<\/td>\n<\/tr>\n<tr data-start=\"1853\" data-end=\"1939\">\n<td>Secunderabad<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/DV-List-SECUNDERABBAD.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/DV-List-SECUNDERABBAD.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>76<\/td>\n<\/tr>\n<tr data-start=\"1940\" data-end=\"2026\">\n<td>Siliguri<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"2027\" data-end=\"2113\">\n<td>Thiruvananthapuram<\/td>\n<td><strong><span style=\"color: #0000ff;\"><div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/TECH_GR_I_RESULT_NOTICE2-TVM.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/TECH_GR_I_RESULT_NOTICE2-TVM.pdf\" class=\"lead-pdf-download\" data-id=\"25556384\">Download PDF<\/a><\/div><\/span><\/strong><\/td>\n<td>30<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2><span class=\"ez-toc-section\" id=\"Railway_RRB_Technician_Grade_1_2025_Cut_Off_%E2%80%93_Direct_Link\"><\/span><strong>Railway RRB Technician Grade 1 2025 Cut Off &#8211; Direct Link<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The RRB Technician Grade 1 2025 Cut Off marks have been released along with the detailed results. Candidates can now check the zone-wise cut-off for each category to see if they meet the minimum qualifying marks for their respective zones.<\/p>\n<p>Along with the cut-off, the detailed result PDF is also available, which includes the list of candidates who have qualified for the next stages. To access both the cut-off and result, click the link below to download the PDFs.<\/p>\n<p style=\"text-align: center;\"><strong><a href=\"https:\/\/www.rrbcdg.gov.in\/\" target=\"_blank\" rel=\"noopener\">Get RRB Technician Gr 1 Cut Off<\/a><\/strong><\/p>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Technician_Grade_1_2025_Cut_Off_%E2%80%93_Zone_Wise_List\"><\/span><strong>RRB Technician Grade 1 2025 Cut Off \u2013 Zone Wise List<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For a quicker reference, we\u2019ve provided a concise list of RRB Technician Grade 1 2025 Cut Off marks for various zones. This summary allows you to easily check the cut-off for each category (UR, SC, ST, OBC\/NCL, EWS, ExSM, R-LD) across different Railway Zones. Use the table below to find the cut-off for your specific zone and category.<\/p>\n<h3 data-start=\"129\" data-end=\"149\"><strong data-start=\"133\" data-end=\"147\">RRB Mumbai<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"150\" data-end=\"909\">\n<thead data-start=\"150\" data-end=\"298\">\n<tr data-start=\"150\" data-end=\"298\">\n<th data-start=\"150\" data-end=\"163\"><strong data-start=\"152\" data-end=\"162\">Cat No<\/strong><\/th>\n<th data-start=\"163\" data-end=\"182\"><strong data-start=\"165\" data-end=\"181\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"182\" data-end=\"205\"><strong data-start=\"184\" data-end=\"204\">Name of the Post<\/strong><\/th>\n<th data-start=\"205\" data-end=\"216\"><strong data-start=\"207\" data-end=\"213\">UR<\/strong><\/th>\n<th data-start=\"216\" data-end=\"227\"><strong data-start=\"218\" data-end=\"224\">SC<\/strong><\/th>\n<th data-start=\"227\" data-end=\"238\"><strong data-start=\"229\" data-end=\"235\">ST<\/strong><\/th>\n<th data-start=\"238\" data-end=\"252\"><strong data-start=\"240\" data-end=\"251\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"252\" data-end=\"264\"><strong data-start=\"254\" data-end=\"261\">EWS<\/strong><\/th>\n<th data-start=\"264\" data-end=\"275\"><strong data-start=\"266\" data-end=\"274\">ExSM<\/strong><\/th>\n<th data-start=\"275\" data-end=\"286\"><strong data-start=\"277\" data-end=\"285\">R-LD<\/strong><\/th>\n<th data-start=\"286\" data-end=\"298\"><strong data-start=\"288\" data-end=\"296\">B-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"448\" data-end=\"909\">\n<tr data-start=\"448\" data-end=\"601\">\n<td>1<\/td>\n<td>CR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>66.98<\/td>\n<td>60.18<\/td>\n<td>55.10<\/td>\n<td>64.25<\/td>\n<td>64.15<\/td>\n<td>31.04<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"602\" data-end=\"755\">\n<td>1<\/td>\n<td>SCR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>67.36<\/td>\n<td>62.36<\/td>\n<td>63.96<\/td>\n<td>&#8212;<\/td>\n<td>42.81<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"756\" data-end=\"909\">\n<td>1<\/td>\n<td>WR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>69.89<\/td>\n<td>59.46<\/td>\n<td>55.11<\/td>\n<td>63.97<\/td>\n<td>64.46<\/td>\n<td>49.04<\/td>\n<td>42.29<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"911\" data-end=\"931\"><strong data-start=\"915\" data-end=\"929\">RRB Ranchi<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"932\" data-end=\"1537\">\n<thead data-start=\"932\" data-end=\"1080\">\n<tr data-start=\"932\" data-end=\"1080\">\n<th data-start=\"932\" data-end=\"945\"><strong data-start=\"934\" data-end=\"944\">Cat No<\/strong><\/th>\n<th data-start=\"945\" data-end=\"964\"><strong data-start=\"947\" data-end=\"963\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"964\" data-end=\"987\"><strong data-start=\"966\" data-end=\"986\">Name of the Post<\/strong><\/th>\n<th data-start=\"987\" data-end=\"998\"><strong data-start=\"989\" data-end=\"995\">UR<\/strong><\/th>\n<th data-start=\"998\" data-end=\"1009\"><strong data-start=\"1000\" data-end=\"1006\">SC<\/strong><\/th>\n<th data-start=\"1009\" data-end=\"1020\"><strong data-start=\"1011\" data-end=\"1017\">ST<\/strong><\/th>\n<th data-start=\"1020\" data-end=\"1034\"><strong data-start=\"1022\" data-end=\"1033\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"1034\" data-end=\"1046\"><strong data-start=\"1036\" data-end=\"1043\">EWS<\/strong><\/th>\n<th data-start=\"1046\" data-end=\"1057\"><strong data-start=\"1048\" data-end=\"1056\">ExSM<\/strong><\/th>\n<th data-start=\"1057\" data-end=\"1068\"><strong data-start=\"1059\" data-end=\"1067\">R-LD<\/strong><\/th>\n<th data-start=\"1068\" data-end=\"1080\"><strong data-start=\"1070\" data-end=\"1078\">B-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"1230\" data-end=\"1537\">\n<tr data-start=\"1230\" data-end=\"1383\">\n<td>1<\/td>\n<td>ECR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>71.72<\/td>\n<td>49.21<\/td>\n<td>&#8212;<\/td>\n<td>69.69<\/td>\n<td>61.22<\/td>\n<td>41.21<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"1384\" data-end=\"1537\">\n<td>1<\/td>\n<td>SER<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>72.04<\/td>\n<td>53.31<\/td>\n<td>64.91<\/td>\n<td>65.81<\/td>\n<td>61.97<\/td>\n<td>41.28<\/td>\n<td>35.49<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"1539\" data-end=\"1558\"><strong data-start=\"1543\" data-end=\"1556\">RRB Ajmer<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"1559\" data-end=\"2164\">\n<thead data-start=\"1559\" data-end=\"1707\">\n<tr data-start=\"1559\" data-end=\"1707\">\n<th data-start=\"1559\" data-end=\"1572\"><strong data-start=\"1561\" data-end=\"1571\">Cat No<\/strong><\/th>\n<th data-start=\"1572\" data-end=\"1591\"><strong data-start=\"1574\" data-end=\"1590\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"1591\" data-end=\"1614\"><strong data-start=\"1593\" data-end=\"1613\">Name of the Post<\/strong><\/th>\n<th data-start=\"1614\" data-end=\"1625\"><strong data-start=\"1616\" data-end=\"1622\">UR<\/strong><\/th>\n<th data-start=\"1625\" data-end=\"1636\"><strong data-start=\"1627\" data-end=\"1633\">SC<\/strong><\/th>\n<th data-start=\"1636\" data-end=\"1647\"><strong data-start=\"1638\" data-end=\"1644\">ST<\/strong><\/th>\n<th data-start=\"1647\" data-end=\"1661\"><strong data-start=\"1649\" data-end=\"1660\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"1661\" data-end=\"1673\"><strong data-start=\"1663\" data-end=\"1670\">EWS<\/strong><\/th>\n<th data-start=\"1673\" data-end=\"1684\"><strong data-start=\"1675\" data-end=\"1683\">ExSM<\/strong><\/th>\n<th data-start=\"1684\" data-end=\"1695\"><strong data-start=\"1686\" data-end=\"1694\">R-LD<\/strong><\/th>\n<th data-start=\"1695\" data-end=\"1707\"><strong data-start=\"1697\" data-end=\"1705\">B-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"1857\" data-end=\"2164\">\n<tr data-start=\"1857\" data-end=\"2010\">\n<td>1<\/td>\n<td>NWR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>69.28<\/td>\n<td>61.31<\/td>\n<td>59.08<\/td>\n<td>67.96<\/td>\n<td>67.96<\/td>\n<td>46.45<\/td>\n<td>50.40<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"2011\" data-end=\"2164\">\n<td>1<\/td>\n<td>WCR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>71.53<\/td>\n<td>62.93<\/td>\n<td>66.30<\/td>\n<td>68.09<\/td>\n<td>67.59<\/td>\n<td>47.76<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"2166\" data-end=\"2186\"><strong data-start=\"2170\" data-end=\"2184\">RRB Bhopal<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"2187\" data-end=\"2792\">\n<thead data-start=\"2187\" data-end=\"2335\">\n<tr data-start=\"2187\" data-end=\"2335\">\n<th data-start=\"2187\" data-end=\"2200\"><strong data-start=\"2189\" data-end=\"2199\">Cat No<\/strong><\/th>\n<th data-start=\"2200\" data-end=\"2219\"><strong data-start=\"2202\" data-end=\"2218\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"2219\" data-end=\"2242\"><strong data-start=\"2221\" data-end=\"2241\">Name of the Post<\/strong><\/th>\n<th data-start=\"2242\" data-end=\"2253\"><strong data-start=\"2244\" data-end=\"2250\">UR<\/strong><\/th>\n<th data-start=\"2253\" data-end=\"2264\"><strong data-start=\"2255\" data-end=\"2261\">SC<\/strong><\/th>\n<th data-start=\"2264\" data-end=\"2275\"><strong data-start=\"2266\" data-end=\"2272\">ST<\/strong><\/th>\n<th data-start=\"2275\" data-end=\"2289\"><strong data-start=\"2277\" data-end=\"2288\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"2289\" data-end=\"2301\"><strong data-start=\"2291\" data-end=\"2298\">EWS<\/strong><\/th>\n<th data-start=\"2301\" data-end=\"2312\"><strong data-start=\"2303\" data-end=\"2311\">ExSM<\/strong><\/th>\n<th data-start=\"2312\" data-end=\"2323\"><strong data-start=\"2314\" data-end=\"2322\">R-LD<\/strong><\/th>\n<th data-start=\"2323\" data-end=\"2335\"><strong data-start=\"2325\" data-end=\"2333\">B-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"2485\" data-end=\"2792\">\n<tr data-start=\"2485\" data-end=\"2638\">\n<td>1<\/td>\n<td>WCR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>66.75<\/td>\n<td>59.85<\/td>\n<td>56.85<\/td>\n<td>65.12<\/td>\n<td>63.18<\/td>\n<td>34.71<\/td>\n<td>50.18<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"2639\" data-end=\"2792\">\n<td>1<\/td>\n<td>WR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>65.59<\/td>\n<td>58.78<\/td>\n<td>56.27<\/td>\n<td>64.15<\/td>\n<td>62.11<\/td>\n<td>31.96<\/td>\n<td>40.18<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"2794\" data-end=\"2817\"><strong data-start=\"2798\" data-end=\"2815\">RRB Allahabad<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"2818\" data-end=\"3423\">\n<thead data-start=\"2818\" data-end=\"2966\">\n<tr data-start=\"2818\" data-end=\"2966\">\n<th data-start=\"2818\" data-end=\"2831\"><strong data-start=\"2820\" data-end=\"2830\">Cat No<\/strong><\/th>\n<th data-start=\"2831\" data-end=\"2850\"><strong data-start=\"2833\" data-end=\"2849\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"2850\" data-end=\"2873\"><strong data-start=\"2852\" data-end=\"2872\">Name of the Post<\/strong><\/th>\n<th data-start=\"2873\" data-end=\"2884\"><strong data-start=\"2875\" data-end=\"2881\">UR<\/strong><\/th>\n<th data-start=\"2884\" data-end=\"2895\"><strong data-start=\"2886\" data-end=\"2892\">SC<\/strong><\/th>\n<th data-start=\"2895\" data-end=\"2906\"><strong data-start=\"2897\" data-end=\"2903\">ST<\/strong><\/th>\n<th data-start=\"2906\" data-end=\"2920\"><strong data-start=\"2908\" data-end=\"2919\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"2920\" data-end=\"2932\"><strong data-start=\"2922\" data-end=\"2929\">EWS<\/strong><\/th>\n<th data-start=\"2932\" data-end=\"2943\"><strong data-start=\"2934\" data-end=\"2942\">ExSM<\/strong><\/th>\n<th data-start=\"2943\" data-end=\"2954\"><strong data-start=\"2945\" data-end=\"2953\">R-LD<\/strong><\/th>\n<th data-start=\"2954\" data-end=\"2966\"><strong data-start=\"2956\" data-end=\"2964\">B-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"3116\" data-end=\"3423\">\n<tr data-start=\"3116\" data-end=\"3269\">\n<td>1<\/td>\n<td>NCR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>70.25<\/td>\n<td>62.67<\/td>\n<td>58.16<\/td>\n<td>68.33<\/td>\n<td>66.48<\/td>\n<td>53.04<\/td>\n<td>53.46<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"3270\" data-end=\"3423\">\n<td>1<\/td>\n<td>NR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>72.84<\/td>\n<td>62.49<\/td>\n<td>58.85<\/td>\n<td>68.33<\/td>\n<td>68.29<\/td>\n<td>51.38<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"3425\" data-end=\"3449\"><strong data-start=\"3429\" data-end=\"3447\">RRB Chandigarh<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"3450\" data-end=\"3901\">\n<thead data-start=\"3450\" data-end=\"3598\">\n<tr data-start=\"3450\" data-end=\"3598\">\n<th data-start=\"3450\" data-end=\"3463\"><strong data-start=\"3452\" data-end=\"3462\">Cat No<\/strong><\/th>\n<th data-start=\"3463\" data-end=\"3482\"><strong data-start=\"3465\" data-end=\"3481\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"3482\" data-end=\"3505\"><strong data-start=\"3484\" data-end=\"3504\">Name of the Post<\/strong><\/th>\n<th data-start=\"3505\" data-end=\"3516\"><strong data-start=\"3507\" data-end=\"3513\">UR<\/strong><\/th>\n<th data-start=\"3516\" data-end=\"3527\"><strong data-start=\"3518\" data-end=\"3524\">SC<\/strong><\/th>\n<th data-start=\"3527\" data-end=\"3538\"><strong data-start=\"3529\" data-end=\"3535\">ST<\/strong><\/th>\n<th data-start=\"3538\" data-end=\"3552\"><strong data-start=\"3540\" data-end=\"3551\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"3552\" data-end=\"3564\"><strong data-start=\"3554\" data-end=\"3561\">EWS<\/strong><\/th>\n<th data-start=\"3564\" data-end=\"3575\"><strong data-start=\"3566\" data-end=\"3574\">ExSM<\/strong><\/th>\n<th data-start=\"3575\" data-end=\"3586\"><strong data-start=\"3577\" data-end=\"3585\">R-LD<\/strong><\/th>\n<th data-start=\"3586\" data-end=\"3598\"><strong data-start=\"3588\" data-end=\"3596\">B-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"3748\" data-end=\"3901\">\n<tr data-start=\"3748\" data-end=\"3901\">\n<td>1<\/td>\n<td>NR<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>68.03<\/td>\n<td>58.09<\/td>\n<td>48.08<\/td>\n<td>62.94<\/td>\n<td>63.80<\/td>\n<td>50.90<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"3903\" data-end=\"3924\"><strong data-start=\"3907\" data-end=\"3922\">RRB Kolkata<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"3925\" data-end=\"4684\">\n<thead data-start=\"3925\" data-end=\"4073\">\n<tr data-start=\"3925\" data-end=\"4073\">\n<th data-start=\"3925\" data-end=\"3938\"><strong data-start=\"3927\" data-end=\"3937\">Cat No<\/strong><\/th>\n<th data-start=\"3938\" data-end=\"3957\"><strong data-start=\"3940\" data-end=\"3956\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"3957\" data-end=\"3980\"><strong data-start=\"3959\" data-end=\"3979\">Name of the Post<\/strong><\/th>\n<th data-start=\"3980\" data-end=\"3991\"><strong data-start=\"3982\" data-end=\"3988\">UR<\/strong><\/th>\n<th data-start=\"3991\" data-end=\"4002\"><strong data-start=\"3993\" data-end=\"3999\">SC<\/strong><\/th>\n<th data-start=\"4002\" data-end=\"4013\"><strong data-start=\"4004\" data-end=\"4010\">ST<\/strong><\/th>\n<th data-start=\"4013\" data-end=\"4027\"><strong data-start=\"4015\" data-end=\"4026\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"4027\" data-end=\"4039\"><strong data-start=\"4029\" data-end=\"4036\">EWS<\/strong><\/th>\n<th data-start=\"4039\" data-end=\"4050\"><strong data-start=\"4041\" data-end=\"4049\">ExSM<\/strong><\/th>\n<th data-start=\"4050\" data-end=\"4061\"><strong data-start=\"4052\" data-end=\"4060\">R-LD<\/strong><\/th>\n<th data-start=\"4061\" data-end=\"4073\"><strong data-start=\"4063\" data-end=\"4071\">B-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"4223\" data-end=\"4684\">\n<tr data-start=\"4223\" data-end=\"4376\">\n<td>1<\/td>\n<td>ER<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>70.99<\/td>\n<td>62.72<\/td>\n<td>57.64<\/td>\n<td>66.67<\/td>\n<td>66.43<\/td>\n<td>45.46<\/td>\n<td>47.67<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"4377\" data-end=\"4530\">\n<td>1<\/td>\n<td>METRO<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>73.83<\/td>\n<td>73.48<\/td>\n<td>46.85<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"4531\" data-end=\"4684\">\n<td>1<\/td>\n<td>SER<\/td>\n<td>Technician Grade I Signal<\/td>\n<td>71.71<\/td>\n<td>62.22<\/td>\n<td>&#8212;<\/td>\n<td>65.17<\/td>\n<td>66.33<\/td>\n<td>68.10<\/td>\n<td>45.79<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"110\" data-end=\"132\"><strong data-start=\"114\" data-end=\"130\">RRB Bilaspur<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"133\" data-end=\"598\">\n<thead data-start=\"133\" data-end=\"249\">\n<tr data-start=\"133\" data-end=\"249\">\n<th data-start=\"133\" data-end=\"146\"><strong data-start=\"135\" data-end=\"143\">Zone<\/strong><\/th>\n<th data-start=\"146\" data-end=\"165\"><strong data-start=\"148\" data-end=\"164\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"165\" data-end=\"176\"><strong data-start=\"167\" data-end=\"173\">UR<\/strong><\/th>\n<th data-start=\"176\" data-end=\"187\"><strong data-start=\"178\" data-end=\"184\">SC<\/strong><\/th>\n<th data-start=\"187\" data-end=\"198\"><strong data-start=\"189\" data-end=\"195\">ST<\/strong><\/th>\n<th data-start=\"198\" data-end=\"212\"><strong data-start=\"200\" data-end=\"211\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"212\" data-end=\"224\"><strong data-start=\"214\" data-end=\"221\">EWS<\/strong><\/th>\n<th data-start=\"224\" data-end=\"235\"><strong data-start=\"226\" data-end=\"234\">ExSM<\/strong><\/th>\n<th data-start=\"235\" data-end=\"249\"><strong data-start=\"237\" data-end=\"245\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"367\" data-end=\"598\">\n<tr data-start=\"367\" data-end=\"483\">\n<td>Bilaspur<\/td>\n<td>CR<\/td>\n<td>67.53<\/td>\n<td>57.50<\/td>\n<td>52.68<\/td>\n<td>64.69<\/td>\n<td>65.23<\/td>\n<td>43.13<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr data-start=\"484\" data-end=\"598\">\n<td>Bilaspur<\/td>\n<td>SECR<\/td>\n<td>67.74<\/td>\n<td>56.98<\/td>\n<td>52.68<\/td>\n<td>64.82<\/td>\n<td>63.12<\/td>\n<td>35.45<\/td>\n<td>43.34<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"600\" data-end=\"623\"><strong data-start=\"604\" data-end=\"621\">RRB Gorakhpur<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"624\" data-end=\"972\">\n<thead data-start=\"624\" data-end=\"740\">\n<tr data-start=\"624\" data-end=\"740\">\n<th data-start=\"624\" data-end=\"637\"><strong data-start=\"626\" data-end=\"634\">Zone<\/strong><\/th>\n<th data-start=\"637\" data-end=\"656\"><strong data-start=\"639\" data-end=\"655\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"656\" data-end=\"667\"><strong data-start=\"658\" data-end=\"664\">UR<\/strong><\/th>\n<th data-start=\"667\" data-end=\"678\"><strong data-start=\"669\" data-end=\"675\">SC<\/strong><\/th>\n<th data-start=\"678\" data-end=\"689\"><strong data-start=\"680\" data-end=\"686\">ST<\/strong><\/th>\n<th data-start=\"689\" data-end=\"703\"><strong data-start=\"691\" data-end=\"702\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"703\" data-end=\"715\"><strong data-start=\"705\" data-end=\"712\">EWS<\/strong><\/th>\n<th data-start=\"715\" data-end=\"726\"><strong data-start=\"717\" data-end=\"725\">ExSM<\/strong><\/th>\n<th data-start=\"726\" data-end=\"740\"><strong data-start=\"728\" data-end=\"736\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"858\" data-end=\"972\">\n<tr data-start=\"858\" data-end=\"972\">\n<td>Gorakhpur<\/td>\n<td>NER<\/td>\n<td>69.76<\/td>\n<td>58.68<\/td>\n<td>51.40<\/td>\n<td>66.59<\/td>\n<td>65.93<\/td>\n<td>43.23<\/td>\n<td>53.40<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"1462\" data-end=\"1483\"><strong data-start=\"1466\" data-end=\"1481\">RRB Chennai<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"1484\" data-end=\"1832\">\n<thead data-start=\"1484\" data-end=\"1600\">\n<tr data-start=\"1484\" data-end=\"1600\">\n<th data-start=\"1484\" data-end=\"1497\"><strong data-start=\"1486\" data-end=\"1494\">Zone<\/strong><\/th>\n<th data-start=\"1497\" data-end=\"1516\"><strong data-start=\"1499\" data-end=\"1515\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"1516\" data-end=\"1527\"><strong data-start=\"1518\" data-end=\"1524\">UR<\/strong><\/th>\n<th data-start=\"1527\" data-end=\"1538\"><strong data-start=\"1529\" data-end=\"1535\">SC<\/strong><\/th>\n<th data-start=\"1538\" data-end=\"1549\"><strong data-start=\"1540\" data-end=\"1546\">ST<\/strong><\/th>\n<th data-start=\"1549\" data-end=\"1563\"><strong data-start=\"1551\" data-end=\"1562\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"1563\" data-end=\"1575\"><strong data-start=\"1565\" data-end=\"1572\">EWS<\/strong><\/th>\n<th data-start=\"1575\" data-end=\"1586\"><strong data-start=\"1577\" data-end=\"1585\">ExSM<\/strong><\/th>\n<th data-start=\"1586\" data-end=\"1600\"><strong data-start=\"1588\" data-end=\"1596\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"1718\" data-end=\"1832\">\n<tr data-start=\"1718\" data-end=\"1832\">\n<td>Chennai<\/td>\n<td>SR<\/td>\n<td>61.29<\/td>\n<td>54.47<\/td>\n<td>47.34<\/td>\n<td>59.49<\/td>\n<td>54.01<\/td>\n<td>37.02<\/td>\n<td>34.60<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"2325\" data-end=\"2348\"><strong data-start=\"2329\" data-end=\"2346\">RRB Ahmedabad<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"2349\" data-end=\"2697\">\n<thead data-start=\"2349\" data-end=\"2465\">\n<tr data-start=\"2349\" data-end=\"2465\">\n<th data-start=\"2349\" data-end=\"2362\"><strong data-start=\"2351\" data-end=\"2359\">Zone<\/strong><\/th>\n<th data-start=\"2362\" data-end=\"2381\"><strong data-start=\"2364\" data-end=\"2380\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"2381\" data-end=\"2392\"><strong data-start=\"2383\" data-end=\"2389\">UR<\/strong><\/th>\n<th data-start=\"2392\" data-end=\"2403\"><strong data-start=\"2394\" data-end=\"2400\">SC<\/strong><\/th>\n<th data-start=\"2403\" data-end=\"2414\"><strong data-start=\"2405\" data-end=\"2411\">ST<\/strong><\/th>\n<th data-start=\"2414\" data-end=\"2428\"><strong data-start=\"2416\" data-end=\"2427\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"2428\" data-end=\"2440\"><strong data-start=\"2430\" data-end=\"2437\">EWS<\/strong><\/th>\n<th data-start=\"2440\" data-end=\"2451\"><strong data-start=\"2442\" data-end=\"2450\">ExSM<\/strong><\/th>\n<th data-start=\"2451\" data-end=\"2465\"><strong data-start=\"2453\" data-end=\"2461\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"2583\" data-end=\"2697\">\n<tr data-start=\"2583\" data-end=\"2697\">\n<td>Ahmedabad<\/td>\n<td>WR<\/td>\n<td>64.51<\/td>\n<td>56.75<\/td>\n<td>53.15<\/td>\n<td>63.09<\/td>\n<td>61.10<\/td>\n<td>30.97<\/td>\n<td>46.67<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"2699\" data-end=\"2722\"><strong data-start=\"2703\" data-end=\"2720\">RRB Bangalore<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"2723\" data-end=\"3071\">\n<thead data-start=\"2723\" data-end=\"2839\">\n<tr data-start=\"2723\" data-end=\"2839\">\n<th data-start=\"2723\" data-end=\"2736\"><strong data-start=\"2725\" data-end=\"2733\">Zone<\/strong><\/th>\n<th data-start=\"2736\" data-end=\"2755\"><strong data-start=\"2738\" data-end=\"2754\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"2755\" data-end=\"2766\"><strong data-start=\"2757\" data-end=\"2763\">UR<\/strong><\/th>\n<th data-start=\"2766\" data-end=\"2777\"><strong data-start=\"2768\" data-end=\"2774\">SC<\/strong><\/th>\n<th data-start=\"2777\" data-end=\"2788\"><strong data-start=\"2779\" data-end=\"2785\">ST<\/strong><\/th>\n<th data-start=\"2788\" data-end=\"2802\"><strong data-start=\"2790\" data-end=\"2801\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"2802\" data-end=\"2814\"><strong data-start=\"2804\" data-end=\"2811\">EWS<\/strong><\/th>\n<th data-start=\"2814\" data-end=\"2825\"><strong data-start=\"2816\" data-end=\"2824\">ExSM<\/strong><\/th>\n<th data-start=\"2825\" data-end=\"2839\"><strong data-start=\"2827\" data-end=\"2835\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"2957\" data-end=\"3071\">\n<tr data-start=\"2957\" data-end=\"3071\">\n<td>Bangalore<\/td>\n<td>SWR<\/td>\n<td>60.79<\/td>\n<td>51.31<\/td>\n<td>46.18<\/td>\n<td>55.08<\/td>\n<td>51.57<\/td>\n<td>34.47<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"3936\" data-end=\"3968\"><strong data-start=\"3940\" data-end=\"3966\">RRB Thiruvananthapuram<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"3969\" data-end=\"4314\">\n<thead data-start=\"3969\" data-end=\"4085\">\n<tr data-start=\"3969\" data-end=\"4085\">\n<th data-start=\"3969\" data-end=\"3982\"><strong data-start=\"3971\" data-end=\"3979\">Zone<\/strong><\/th>\n<th data-start=\"3982\" data-end=\"4001\"><strong data-start=\"3984\" data-end=\"4000\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"4001\" data-end=\"4012\"><strong data-start=\"4003\" data-end=\"4009\">UR<\/strong><\/th>\n<th data-start=\"4012\" data-end=\"4023\"><strong data-start=\"4014\" data-end=\"4020\">SC<\/strong><\/th>\n<th data-start=\"4023\" data-end=\"4034\"><strong data-start=\"4025\" data-end=\"4031\">ST<\/strong><\/th>\n<th data-start=\"4034\" data-end=\"4048\"><strong data-start=\"4036\" data-end=\"4047\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"4048\" data-end=\"4060\"><strong data-start=\"4050\" data-end=\"4057\">EWS<\/strong><\/th>\n<th data-start=\"4060\" data-end=\"4071\"><strong data-start=\"4062\" data-end=\"4070\">ExSM<\/strong><\/th>\n<th data-start=\"4071\" data-end=\"4085\"><strong data-start=\"4073\" data-end=\"4081\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"4203\" data-end=\"4314\">\n<tr data-start=\"4203\" data-end=\"4314\">\n<td>Thiruvananthapuram<\/td>\n<td>SR<\/td>\n<td>65.63<\/td>\n<td>55.36<\/td>\n<td>49.46<\/td>\n<td>64.27<\/td>\n<td>56.27<\/td>\n<td>38.76<\/td>\n<td>29.74<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"4316\" data-end=\"4342\"><strong data-start=\"4320\" data-end=\"4340\">RRB Secunderabad<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"4343\" data-end=\"4691\">\n<thead data-start=\"4343\" data-end=\"4459\">\n<tr data-start=\"4343\" data-end=\"4459\">\n<th data-start=\"4343\" data-end=\"4356\"><strong data-start=\"4345\" data-end=\"4353\">Zone<\/strong><\/th>\n<th data-start=\"4356\" data-end=\"4375\"><strong data-start=\"4358\" data-end=\"4374\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"4375\" data-end=\"4386\"><strong data-start=\"4377\" data-end=\"4383\">UR<\/strong><\/th>\n<th data-start=\"4386\" data-end=\"4397\"><strong data-start=\"4388\" data-end=\"4394\">SC<\/strong><\/th>\n<th data-start=\"4397\" data-end=\"4408\"><strong data-start=\"4399\" data-end=\"4405\">ST<\/strong><\/th>\n<th data-start=\"4408\" data-end=\"4422\"><strong data-start=\"4410\" data-end=\"4421\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"4422\" data-end=\"4434\"><strong data-start=\"4424\" data-end=\"4431\">EWS<\/strong><\/th>\n<th data-start=\"4434\" data-end=\"4445\"><strong data-start=\"4436\" data-end=\"4444\">ExSM<\/strong><\/th>\n<th data-start=\"4445\" data-end=\"4459\"><strong data-start=\"4447\" data-end=\"4455\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"4577\" data-end=\"4691\">\n<tr data-start=\"4577\" data-end=\"4691\">\n<td>Secunderabad<\/td>\n<td>SCR<\/td>\n<td>73.53<\/td>\n<td>59.78<\/td>\n<td>64.31<\/td>\n<td>69.52<\/td>\n<td>67.54<\/td>\n<td>47.68<\/td>\n<td>64.91<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"4693\" data-end=\"4712\"><strong data-start=\"4697\" data-end=\"4710\">RRB Patna<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"4713\" data-end=\"5061\">\n<thead data-start=\"4713\" data-end=\"4829\">\n<tr data-start=\"4713\" data-end=\"4829\">\n<th data-start=\"4713\" data-end=\"4726\"><strong data-start=\"4715\" data-end=\"4723\">Zone<\/strong><\/th>\n<th data-start=\"4726\" data-end=\"4745\"><strong data-start=\"4728\" data-end=\"4744\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"4745\" data-end=\"4756\"><strong data-start=\"4747\" data-end=\"4753\">UR<\/strong><\/th>\n<th data-start=\"4756\" data-end=\"4767\"><strong data-start=\"4758\" data-end=\"4764\">SC<\/strong><\/th>\n<th data-start=\"4767\" data-end=\"4778\"><strong data-start=\"4769\" data-end=\"4775\">ST<\/strong><\/th>\n<th data-start=\"4778\" data-end=\"4792\"><strong data-start=\"4780\" data-end=\"4791\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"4792\" data-end=\"4804\"><strong data-start=\"4794\" data-end=\"4801\">EWS<\/strong><\/th>\n<th data-start=\"4804\" data-end=\"4815\"><strong data-start=\"4806\" data-end=\"4814\">ExSM<\/strong><\/th>\n<th data-start=\"4815\" data-end=\"4829\"><strong data-start=\"4817\" data-end=\"4825\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"4947\" data-end=\"5061\">\n<tr data-start=\"4947\" data-end=\"5061\">\n<td>Patna<\/td>\n<td>ECR<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>54.48<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 data-start=\"5063\" data-end=\"5088\"><strong data-start=\"5067\" data-end=\"5086\">RRB Muzaffarpur<\/strong><\/h3>\n<div class=\"overflow-x-auto contain-inline-size\">\n<table data-start=\"5089\" data-end=\"5437\">\n<thead data-start=\"5089\" data-end=\"5205\">\n<tr data-start=\"5089\" data-end=\"5205\">\n<th data-start=\"5089\" data-end=\"5102\"><strong data-start=\"5091\" data-end=\"5099\">Zone<\/strong><\/th>\n<th data-start=\"5102\" data-end=\"5121\"><strong data-start=\"5104\" data-end=\"5120\">Railway \/ PU<\/strong><\/th>\n<th data-start=\"5121\" data-end=\"5132\"><strong data-start=\"5123\" data-end=\"5129\">UR<\/strong><\/th>\n<th data-start=\"5132\" data-end=\"5143\"><strong data-start=\"5134\" data-end=\"5140\">SC<\/strong><\/th>\n<th data-start=\"5143\" data-end=\"5154\"><strong data-start=\"5145\" data-end=\"5151\">ST<\/strong><\/th>\n<th data-start=\"5154\" data-end=\"5168\"><strong data-start=\"5156\" data-end=\"5167\">OBC\/NCL<\/strong><\/th>\n<th data-start=\"5168\" data-end=\"5180\"><strong data-start=\"5170\" data-end=\"5177\">EWS<\/strong><\/th>\n<th data-start=\"5180\" data-end=\"5191\"><strong data-start=\"5182\" data-end=\"5190\">ExSM<\/strong><\/th>\n<th data-start=\"5191\" data-end=\"5205\"><strong data-start=\"5193\" data-end=\"5201\">R-LD<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"5323\" data-end=\"5437\">\n<tr data-start=\"5323\" data-end=\"5437\">\n<td>Muzaffarpur<\/td>\n<td>ECR<\/td>\n<td>65.59<\/td>\n<td>51.25<\/td>\n<td>46.44<\/td>\n<td>65.25<\/td>\n<td>&#8212;<\/td>\n<td>40.98<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 data-start=\"0\" data-end=\"103\"><span class=\"ez-toc-section\" id=\"Step_to_Check_RRB_Technician_Grade_1_Cut_Off_2025\"><\/span><strong>Step to Check RRB Technician Grade 1 Cut Off 2025<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"0\" data-end=\"103\">To check the RRB Technician Grade 1 2025 cut-off for your zone and category, follow these simple steps:<\/p>\n<ol data-start=\"105\" data-end=\"1041\">\n<li data-start=\"105\" data-end=\"254\">\n<p data-start=\"108\" data-end=\"254\"><strong data-start=\"108\" data-end=\"138\">Visit the Official Website<\/strong>: Go to the official Railway Recruitment Board (RRB) website <a href=\"https:\/\/www.rrbcdg.gov.in\" target=\"_new\" rel=\"noopener\" data-start=\"199\" data-end=\"253\">https:\/\/www.rrbcdg.gov.in<\/a>.<\/p>\n<\/li>\n<li data-start=\"258\" data-end=\"428\">\n<p data-start=\"261\" data-end=\"428\"><strong data-start=\"261\" data-end=\"296\">Navigate to the Results Section<\/strong>: Look for the CEN 02\/2024 (Technician) section on the homepage. Click on it to access the relevant results and cut-off details.<\/p>\n<\/li>\n<li data-start=\"430\" data-end=\"621\">\n<p data-start=\"433\" data-end=\"621\"><strong data-start=\"433\" data-end=\"453\">Select Your Zone<\/strong>: Find the Technician Grade 1 Cut Off 2025 for your specific railway zone. Each zone (e.g., Bilaspur, Gorakhpur, Allahabad) will have its own separate cut-off list.<\/p>\n<\/li>\n<li data-start=\"623\" data-end=\"871\">\n<p data-start=\"626\" data-end=\"871\"><strong data-start=\"626\" data-end=\"646\">Download the PDF<\/strong>: Once you open the cut-off section for your zone, you can download the cut-off PDF for further reference. This PDF will display the cut-off marks for each category (UR, SC, ST, OBC\/NCL, EWS, ExSM, R-LD) across all zones.<\/p>\n<\/li>\n<li data-start=\"873\" data-end=\"1041\">\n<p data-start=\"876\" data-end=\"1041\"><strong data-start=\"876\" data-end=\"899\">Check Your Category<\/strong>: Match your category (e.g., UR, OBC, SC, ST) with the corresponding cut-off marks in the PDF to see if you have qualified for the next stage.<\/p>\n<\/li>\n<\/ol>\n<p>Refer to the official website for more details. Stay updated with RRB announcements for further selection stages. Best of luck!<\/p>\n<div class=\"modal\" id=\"modal25556384\"><div class=\"modal-content\"><span class=\"close-button\">&times;<\/span>\n\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f25556384-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"25556384\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/blog\/wp-json\/wp\/v2\/posts\/25605603#wpcf7-f25556384-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"25556384\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.4\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f25556384-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/><input type=\"hidden\" name=\"_wpcf7cf_hidden_group_fields\" value=\"[]\" \/><input type=\"hidden\" name=\"_wpcf7cf_hidden_groups\" value=\"[]\" \/><input type=\"hidden\" name=\"_wpcf7cf_visible_groups\" value=\"[]\" \/><input type=\"hidden\" name=\"_wpcf7cf_repeaters\" value=\"[]\" \/><input type=\"hidden\" name=\"_wpcf7cf_steps\" value=\"{}\" \/><input type=\"hidden\" name=\"_wpcf7cf_options\" value=\"{&quot;form_id&quot;:25556384,&quot;conditions&quot;:[{&quot;then_field&quot;:&quot;-1&quot;,&quot;and_rules&quot;:[{&quot;if_field&quot;:&quot;-1&quot;,&quot;operator&quot;:&quot;equals&quot;,&quot;if_value&quot;:&quot;Kerala PSC Exams&quot;}]},{&quot;then_field&quot;:&quot;-1&quot;,&quot;and_rules&quot;:[{&quot;if_field&quot;:&quot;-1&quot;,&quot;operator&quot;:&quot;equals&quot;,&quot;if_value&quot;:&quot;Kerala PSC Teaching Exams&quot;}]},{&quot;then_field&quot;:&quot;-1&quot;,&quot;and_rules&quot;:[{&quot;if_field&quot;:&quot;-1&quot;,&quot;operator&quot;:&quot;equals&quot;,&quot;if_value&quot;:&quot;Kerala PSC Technical Exams&quot;}]}],&quot;settings&quot;:{&quot;animation&quot;:&quot;yes&quot;,&quot;animation_intime&quot;:200,&quot;animation_outtime&quot;:200,&quot;conditions_ui&quot;:&quot;normal&quot;,&quot;notice_dismissed&quot;:false,&quot;notice_dismissed_update-cf7-5.9.8&quot;:true,&quot;notice_dismissed_update-cf7-6.1.1&quot;:true}}\" \/>\n<\/fieldset>\n<div class=\"custom-form-1\" id=\"custom-form-1\">\n\t<div class=\"custom-form-group-1\">\n\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"full-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Full Name\" value=\"\" type=\"text\" name=\"full-name\" \/><\/span>\n\t\t<\/p>\n\t<\/div>\n\t<div class=\"custom-form-group-1\">\n\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"phone\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone Number\" value=\"\" type=\"tel\" name=\"phone\" \/><\/span>\n\t\t<\/p>\n\t<\/div>\n\t<div class=\"custom-form-group-1\">\n\t\t<div class=\"custom-select-wrapper\">\n\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"language\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required cf7-0678-exam-language\" aria-required=\"true\" aria-invalid=\"false\" name=\"language\"><option value=\"\">Select Language<\/option><option value=\"Malayalam\">Malayalam<\/option><option value=\"Tamil\">Tamil<\/option><option value=\"Telugu\">Telugu<\/option><option value=\"Kannada\">Kannada<\/option><option value=\"Hindi\">Hindi<\/option><\/select><\/span>\n\t\t\t<\/p>\n\t\t<\/div>\n\t<\/div>\n\t<div class=\"custom-form-group-1\">\n\t\t<div class=\"custom-select-wrapper\">\n\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"course\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required cf7-0678-exam-category-select\" aria-required=\"true\" aria-invalid=\"false\" name=\"course\"><option value=\"\">Select an option<\/option><option value=\"Kerala PSC Exams\">Kerala PSC Exams<\/option><option value=\"Teaching Govt Exams\">Teaching Govt Exams<\/option><option value=\"Technical Govt Exams\">Technical Govt Exams<\/option><option value=\"SSC RRB\">SSC RRB<\/option><option value=\"Banking\">Banking<\/option><option value=\"Coding\">Coding<\/option><option value=\"Digital Marketing\">Digital Marketing<\/option><option value=\"Language Learning\">Language Learning<\/option><option value=\"Accounting &amp; Taxation\">Accounting &amp; Taxation<\/option><option value=\"SAP\">SAP<\/option><option value=\"Personal Finance\">Personal Finance<\/option><option value=\"Civil &amp; Mech Upskilling\">Civil &amp; Mech Upskilling<\/option><option value=\"Electronics Upskilling\">Electronics Upskilling<\/option><option value=\"Montessori &amp; Yoga TTC\">Montessori &amp; Yoga TTC<\/option><option value=\"Healthcare\">Healthcare<\/option><option value=\"HR Management\">HR Management<\/option><option value=\"College Entrance Exams\">College Entrance Exams<\/option><option value=\"Accounting\">Accounting<\/option><option value=\"TNPSC\">TNPSC<\/option><option value=\"Other Exams\">Other Exams<\/option><\/select><\/span>\n\t\t\t<\/p>\n\t\t<\/div>\n\t<\/div>\n\t<div class=\"custom-form-group-1\">\n\t\t<div class=\"custom-select-wrapper\">\n\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"exam-name\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required cf7-0678-exam-name-select\" aria-required=\"true\" aria-invalid=\"false\" name=\"exam-name\"><option value=\"\">Select an option<\/option><option value=\"Degree Level Exams\">Degree Level Exams<\/option><option value=\"Plus two Level exams\">Plus two Level exams<\/option><option value=\"10th level exam\">10th level exam<\/option><option value=\"LGS (Company Board, University etc)\">LGS (Company Board, University etc)<\/option><option value=\"LDC\">LDC<\/option><option value=\"Village Field Assistant\">Village Field Assistant<\/option><option value=\"Assistant salesman\">Assistant salesman<\/option><option value=\"Secretariat OA\">Secretariat OA<\/option><option value=\"Uniform Posts(Police, Excise, Forest, Fire)\">Uniform Posts(Police, Excise, Forest, Fire)<\/option><option value=\"BevCo LD\">BevCo LD<\/option><option value=\"Devaswom Board LDC\">Devaswom Board LDC<\/option><option value=\"Driver Exams\">Driver Exams<\/option><option value=\"SBCID\">SBCID<\/option><option value=\"LSGD\">LSGD<\/option><option value=\"Secretariant Assistant\">Secretariant Assistant<\/option><option value=\"Company Board Assistant\">Company Board Assistant<\/option><option value=\"University Assistant\">University Assistant<\/option><option value=\"Kerala Administrative Tribunal\">Kerala Administrative Tribunal<\/option><option value=\"Driver cum OA\">Driver cum OA<\/option><option value=\"ICDS\">ICDS<\/option><option value=\"CDPO\">CDPO<\/option><option value=\"Finger Print Searcher\">Finger Print Searcher<\/option><option value=\"Welfare Officer\">Welfare Officer<\/option><option value=\"Probation Officer\">Probation Officer<\/option><option value=\"Scientific Officer\">Scientific Officer<\/option><option value=\"HSST\">HSST<\/option><option value=\"SET\">SET<\/option><option value=\"KTET\">KTET<\/option><option value=\"HSA\">HSA<\/option><option value=\"LP\/UP Assistant\">LP\/UP Assistant<\/option><option value=\"EMRS\">EMRS<\/option><option value=\"KVS PGT &amp; TGT, PRT\">KVS PGT &amp; TGT, PRT<\/option><option value=\"RRB TGT&amp; PGT, PRT\">RRB TGT&amp; PGT, PRT<\/option><option value=\"AE (PCB, PWD, KSEB, etc)\">AE (PCB, PWD, KSEB, etc)<\/option><option value=\"PWD Engineering Assistant\">PWD Engineering Assistant<\/option><option value=\"KSEB Sub Engineer\">KSEB Sub Engineer<\/option><option value=\"KSEB Worker\">KSEB Worker<\/option><option value=\"Overseer\/Draftsman (Grade 1, 2, 3 )\">Overseer\/Draftsman (Grade 1, 2, 3 )<\/option><option value=\"PWD Overseer\">PWD Overseer<\/option><option value=\"Tradesman\">Tradesman<\/option><option value=\"Lecturer in Poly\">Lecturer in Poly<\/option><option value=\"Lecturer in Tools &amp; Die Engineering\">Lecturer in Tools &amp; Die Engineering<\/option><option value=\"Assistant Electrical Inspector\">Assistant Electrical Inspector<\/option><option value=\"Lineman\/ Electrician\">Lineman\/ Electrician<\/option><option value=\"Technician Grade 2\">Technician Grade 2<\/option><option value=\"Foreman\">Foreman<\/option><option value=\"Assistant Motor Vehicle Inspector (AMVI)\">Assistant Motor Vehicle Inspector (AMVI)<\/option><option value=\"MMV Training Instuctor\">MMV Training Instuctor<\/option><option value=\"Computer Programmer\">Computer Programmer<\/option><option value=\"Computer Engineer\">Computer Engineer<\/option><option value=\"Junior Instructor\">Junior Instructor<\/option><option value=\"Assistant Professor (Tech)\">Assistant Professor (Tech)<\/option><option value=\"Assistant Town Planner\">Assistant Town Planner<\/option><option value=\"KWA Draftsman Grade 3\">KWA Draftsman Grade 3<\/option><option value=\"KWA Operator\">KWA Operator<\/option><option value=\"KWA Plumber\">KWA Plumber<\/option><option value=\"KWA Meter Reader\">KWA Meter Reader<\/option><option value=\"ISRO Scientist (Electronics, Electrical, Mech, Civil)\">ISRO Scientist (Electronics, Electrical, Mech, Civil)<\/option><option value=\"ISRO Technician\">ISRO Technician<\/option><option value=\"VSSC Technical Assistant\">VSSC Technical Assistant<\/option><option value=\"GATE\">GATE<\/option><option value=\"NHPC JE\">NHPC JE<\/option><option value=\"CIL MT\">CIL MT<\/option><option value=\"CL MT\">CL MT<\/option><option value=\"IOCL Electrical Engineering\">IOCL Electrical Engineering<\/option><option value=\"AAI ATC\">AAI ATC<\/option><option value=\"Central Govt PSU\">Central Govt PSU<\/option><option value=\"RRB NTPC\">RRB NTPC<\/option><option value=\"RRB RPF\">RRB RPF<\/option><option value=\"RRB Group D\">RRB Group D<\/option><option value=\"RRB Section Controller\">RRB Section Controller<\/option><option value=\"SSC CPO\">SSC CPO<\/option><option value=\"SSC CGL\">SSC CGL<\/option><option value=\"SSC CHSL\">SSC CHSL<\/option><option value=\"SSC GD\">SSC GD<\/option><option value=\"SSC MTS\">SSC MTS<\/option><option value=\"SSC Stenographer\">SSC Stenographer<\/option><option value=\"Delhi Police Constable Executive\">Delhi Police Constable Executive<\/option><option value=\"Delhi Police Head Constable\">Delhi Police Head Constable<\/option><option value=\"Delhi Police Driver\">Delhi Police Driver<\/option><option value=\"SSC Selection Post\">SSC Selection Post<\/option><option value=\"RRB JE\">RRB JE<\/option><option value=\"RRB ALP\">RRB ALP<\/option><option value=\"SSC JE\">SSC JE<\/option><option value=\"CSEB Exam\">CSEB Exam<\/option><option value=\"IBPS Clerk\">IBPS Clerk<\/option><option value=\"IBPS PO\">IBPS PO<\/option><option value=\"IBPS RRB\">IBPS RRB<\/option><option value=\"IBPS SO\">IBPS SO<\/option><option value=\"SBI Clerk\">SBI Clerk<\/option><option value=\"SBI PO\">SBI PO<\/option><option value=\"KSCARD Assistant\">KSCARD Assistant<\/option><option value=\"JCI Khadi Board\">JCI Khadi Board<\/option><option value=\"Kerala Bank Exam\">Kerala Bank Exam<\/option><option value=\"Kerala Gramina Bank\">Kerala Gramina Bank<\/option><option value=\"NABARD\">NABARD<\/option><option value=\"RBI Assistant\">RBI Assistant<\/option><option value=\"Insurance Exams\">Insurance Exams<\/option><option value=\"SBI Apprentice\">SBI Apprentice<\/option><option value=\"FCI Manager and Assistant\">FCI Manager and Assistant<\/option><option value=\"Federal Bank Exams\">Federal Bank Exams<\/option><option value=\"SEBI Grade A\">SEBI Grade A<\/option><option value=\"IDBI Junior Assistant Manager\">IDBI Junior Assistant Manager<\/option><option value=\"Canara Bank PO\">Canara Bank PO<\/option><option value=\"Other Bank Exams\">Other Bank Exams<\/option><option value=\"Data Science Course\">Data Science Course<\/option><option value=\"Data Analytics Course\">Data Analytics Course<\/option><option value=\"Full Stack Development Course\">Full Stack Development Course<\/option><option value=\"Python Programming Course\">Python Programming Course<\/option><option value=\"Software Testing Course\">Software Testing Course<\/option><option value=\"UI\/UX\">UI\/UX<\/option><option value=\"Cybersecurity\">Cybersecurity<\/option><option value=\"AWS Course\">AWS Course<\/option><option value=\"Digital Marketing\">Digital Marketing<\/option><option value=\"Performance Marketing Course\">Performance Marketing Course<\/option><option value=\"German Language\">German Language<\/option><option value=\"IELTS\">IELTS<\/option><option value=\"Spoken English\">Spoken English<\/option><option value=\"Career Level up Course\">Career Level up Course<\/option><option value=\"Business Accounting and Finance Certification\">Business Accounting and Finance Certification<\/option><option value=\"GCC Accounting\">GCC Accounting<\/option><option value=\"PwC Edge: Strategic Accounting &amp; Finance Programme\">PwC Edge: Strategic Accounting &amp; Finance Programme<\/option><option value=\"ACCA\">ACCA<\/option><option value=\"Enrolled Agent\">Enrolled Agent<\/option><option value=\"PwC Certified Tax Professional\">PwC Certified Tax Professional<\/option><option value=\"CMA USA\">CMA USA<\/option><option value=\"SAP FICO Course\">SAP FICO Course<\/option><option value=\"SAP MM Course\">SAP MM Course<\/option><option value=\"SAP SD Course\">SAP SD Course<\/option><option value=\"Stock Market Course\">Stock Market Course<\/option><option value=\"Forex Trading\">Forex Trading<\/option><option value=\"Mutual Funds\">Mutual Funds<\/option><option value=\"Quantity Surveying\">Quantity Surveying<\/option><option value=\"Structural Design\">Structural Design<\/option><option value=\"BIM\">BIM<\/option><option value=\"MEP\">MEP<\/option><option value=\"Embedded System Software Engineering\">Embedded System Software Engineering<\/option><option value=\"Montessori Teacher Training\">Montessori Teacher Training<\/option><option value=\"Yoga TTC\">Yoga TTC<\/option><option value=\"Hospital Administration\">Hospital Administration<\/option><option value=\"HR Management\">HR Management<\/option><option value=\"CAT\">CAT<\/option><option value=\"MAT\">MAT<\/option><option value=\"KMAT\">KMAT<\/option><option value=\"TNPSC\">TNPSC<\/option><option value=\"Tracer\">Tracer<\/option><option value=\"Legal Metrology Inspector\">Legal Metrology Inspector<\/option><option value=\"Electrical Line Helper\">Electrical Line Helper<\/option><option value=\"Robotics &amp; AI Course\">Robotics &amp; AI Course<\/option><\/select><\/span>\n\t\t\t<\/p>\n\t\t<\/div>\n\t<\/div>\n\t<div class=\"d-none\">\n\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"education\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Educational qualification\" value=\"\" type=\"text\" name=\"education\" \/><\/span>\n\t\t<\/p>\n\t\t<div style=\"display:none\">\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden utm-so\" value=\"\" type=\"hidden\" name=\"utm_source\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden utm-medium\" value=\"\" type=\"hidden\" name=\"utm_medium\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden utm-campaign\" value=\"\" type=\"hidden\" name=\"utm_campaign\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden utm-content\" value=\"\" type=\"hidden\" name=\"utm_content\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden utm-term\" value=\"\" type=\"hidden\" name=\"utm_term\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden blog-url\" value=\"\" type=\"hidden\" name=\"blog_url\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden post-category-name\" value=\"\" type=\"hidden\" name=\"post_category_name\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden post-author-name\" value=\"\" type=\"hidden\" name=\"post_author_name\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden file-url\" value=\"\" type=\"hidden\" name=\"file_url\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden video-url\" value=\"\" type=\"hidden\" name=\"video_url\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden courseid\" value=\"\" type=\"hidden\" name=\"course_id\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden exam-name\" value=\"\" type=\"hidden\" name=\"exam_name\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden interested-course\" value=\"\" type=\"hidden\" name=\"interested_course\" \/>\n\t\t<input class=\"wpcf7-form-control wpcf7-hidden uid\" value=\"\" type=\"hidden\" name=\"business_category_uid\" \/>\n\t\t<\/div>\n\t\t<div class=\"cf7-cf-turnstile\" style=\"margin-top: 0px; margin-bottom: -15px;\"> <div id=\"cf-turnstile-cf7-90578345\" class=\"cf-turnstile\" data-sitekey=\"0x4AAAAAABVigxtkiZeGTu5L\" data-theme=\"light\" data-language=\"auto\" data-size=\"normal\" data-retry=\"auto\" data-retry-interval=\"1000\" data-action=\"contact-form-7\" data-appearance=\"always\"><\/div> <script>document.addEventListener(\"DOMContentLoaded\", function() { setTimeout(function(){ var e=document.getElementById(\"cf-turnstile-cf7-90578345\"); e&&!e.innerHTML.trim()&&(turnstile.remove(\"#cf-turnstile-cf7-90578345\"), turnstile.render(\"#cf-turnstile-cf7-90578345\", {sitekey:\"0x4AAAAAABVigxtkiZeGTu5L\"})); }, 0); });<\/script> <br class=\"cf-turnstile-br cf-turnstile-br-cf7-90578345\"> <style>#cf-turnstile-cf7-90578345 { margin-left: -15px; }<\/style> <script>document.addEventListener(\"DOMContentLoaded\",function(){document.querySelectorAll('.wpcf7-form').forEach(function(e){e.addEventListener('submit',function(){if(document.getElementById('cf-turnstile-cf7-90578345')){setTimeout(function(){turnstile.reset('#cf-turnstile-cf7-90578345');},1000)}})})});<\/script> <\/div><br\/><input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Submit\" \/>\n\t\t<\/p>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n\n<\/div><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The RRB Technician Grade 1 Result 2025 has been released, and candidates who appeared for the exam held from 19th to 20th December 2024 can now check their results. Along with the results, the RRB Technician Grade 1 Cut Off 2025 is also available, specifying the minimum qualifying marks required for each category. The cut-off [&hellip;]<\/p>\n","protected":false},"author":115,"featured_media":25605606,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[802,146],"tags":[],"class_list":["post-25605603","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles","category-rrb"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Railway RRB Technician Grade 1 Cut Off 2025 - Zone Wise<\/title>\n<meta name=\"description\" content=\"Check the RRB Technician Grade 1 Cut Off 2025 zone-wise for each category. Find the minimum qualifying marks for the next stage.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Railway RRB Technician Grade 1 Cut Off 2025 - Zone Wise\" \/>\n<meta property=\"og:description\" content=\"Check the RRB Technician Grade 1 Cut Off 2025 zone-wise for each category. Find the minimum qualifying marks for the next stage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/\" \/>\n<meta property=\"og:site_name\" content=\"Entri Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/entri.me\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-12T09:53:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-13T10:30:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png\" \/>\n\t<meta property=\"og:image:width\" content=\"820\" \/>\n\t<meta property=\"og:image:height\" content=\"615\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Sreesha V.S\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@entri_app\" \/>\n<meta name=\"twitter:site\" content=\"@entri_app\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sreesha V.S\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/\"},\"author\":{\"name\":\"Sreesha V.S\",\"@id\":\"https:\/\/entri.app\/blog\/#\/schema\/person\/76260ad43c26c5230e8ad1f11ba1fc30\"},\"headline\":\"RRB Technician Grade 1 Cut Off 2025 &#8211; Zone Wise\",\"datePublished\":\"2025-03-12T09:53:06+00:00\",\"dateModified\":\"2025-03-13T10:30:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/\"},\"wordCount\":1366,\"publisher\":{\"@id\":\"https:\/\/entri.app\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png\",\"articleSection\":[\"Articles\",\"Railway\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/\",\"url\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/\",\"name\":\"Railway RRB Technician Grade 1 Cut Off 2025 - Zone Wise\",\"isPartOf\":{\"@id\":\"https:\/\/entri.app\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png\",\"datePublished\":\"2025-03-12T09:53:06+00:00\",\"dateModified\":\"2025-03-13T10:30:38+00:00\",\"description\":\"Check the RRB Technician Grade 1 Cut Off 2025 zone-wise for each category. Find the minimum qualifying marks for the next stage.\",\"breadcrumb\":{\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#primaryimage\",\"url\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png\",\"contentUrl\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png\",\"width\":820,\"height\":615,\"caption\":\"Railway RRB Technician Grade 1 Cut Off 2025 - Zone Wise\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/entri.app\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Railway\",\"item\":\"https:\/\/entri.app\/blog\/category\/rrb\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"RRB Technician Grade 1 Cut Off 2025 &#8211; Zone Wise\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/entri.app\/blog\/#website\",\"url\":\"https:\/\/entri.app\/blog\/\",\"name\":\"Entri Blog\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/entri.app\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/entri.app\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/entri.app\/blog\/#organization\",\"name\":\"Entri App\",\"url\":\"https:\/\/entri.app\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png\",\"contentUrl\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png\",\"width\":989,\"height\":446,\"caption\":\"Entri App\"},\"image\":{\"@id\":\"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/entri.me\/\",\"https:\/\/x.com\/entri_app\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/entri.app\/blog\/#\/schema\/person\/76260ad43c26c5230e8ad1f11ba1fc30\",\"name\":\"Sreesha V.S\",\"description\":\"Sreesha is a professional content writer with over 4 years of experience in the industry. She specializes in writing copy for websites, blogs, social media advertisements, Wikipedia, and other digital news content. Her expertise lies in crafting high-quality content on various topics such as education, business, finance, lifestyle, and health. Over the years, Sreesha has worked on nearly 700+ articles, several website copies, social media ads, and even a Wikipedia page. Sreesha holds a Master's degree in Journalism and Mass Communication from Kannur University, where she specialized in areas such as multimedia journalism, print media, and advertising.\",\"sameAs\":[\"https:\/\/entri.app\/\",\"https:\/\/www.linkedin.com\/in\/sreesha-v-s-2263a71bb\"],\"url\":\"https:\/\/entri.app\/blog\/author\/sreesha\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Railway RRB Technician Grade 1 Cut Off 2025 - Zone Wise","description":"Check the RRB Technician Grade 1 Cut Off 2025 zone-wise for each category. Find the minimum qualifying marks for the next stage.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/","og_locale":"en_US","og_type":"article","og_title":"Railway RRB Technician Grade 1 Cut Off 2025 - Zone Wise","og_description":"Check the RRB Technician Grade 1 Cut Off 2025 zone-wise for each category. Find the minimum qualifying marks for the next stage.","og_url":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/","og_site_name":"Entri Blog","article_publisher":"https:\/\/www.facebook.com\/entri.me\/","article_published_time":"2025-03-12T09:53:06+00:00","article_modified_time":"2025-03-13T10:30:38+00:00","og_image":[{"width":820,"height":615,"url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png","type":"image\/png"}],"author":"Sreesha V.S","twitter_card":"summary_large_image","twitter_creator":"@entri_app","twitter_site":"@entri_app","twitter_misc":{"Written by":"Sreesha V.S","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#article","isPartOf":{"@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/"},"author":{"name":"Sreesha V.S","@id":"https:\/\/entri.app\/blog\/#\/schema\/person\/76260ad43c26c5230e8ad1f11ba1fc30"},"headline":"RRB Technician Grade 1 Cut Off 2025 &#8211; Zone Wise","datePublished":"2025-03-12T09:53:06+00:00","dateModified":"2025-03-13T10:30:38+00:00","mainEntityOfPage":{"@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/"},"wordCount":1366,"publisher":{"@id":"https:\/\/entri.app\/blog\/#organization"},"image":{"@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#primaryimage"},"thumbnailUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png","articleSection":["Articles","Railway"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/","url":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/","name":"Railway RRB Technician Grade 1 Cut Off 2025 - Zone Wise","isPartOf":{"@id":"https:\/\/entri.app\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#primaryimage"},"image":{"@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#primaryimage"},"thumbnailUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png","datePublished":"2025-03-12T09:53:06+00:00","dateModified":"2025-03-13T10:30:38+00:00","description":"Check the RRB Technician Grade 1 Cut Off 2025 zone-wise for each category. Find the minimum qualifying marks for the next stage.","breadcrumb":{"@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#primaryimage","url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png","contentUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/03\/Untitled-2025-03-13T152800.018.png","width":820,"height":615,"caption":"Railway RRB Technician Grade 1 Cut Off 2025 - Zone Wise"},{"@type":"BreadcrumbList","@id":"https:\/\/entri.app\/blog\/rrb-technician-grade-1-cut-off\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/entri.app\/blog\/"},{"@type":"ListItem","position":2,"name":"Railway","item":"https:\/\/entri.app\/blog\/category\/rrb\/"},{"@type":"ListItem","position":3,"name":"RRB Technician Grade 1 Cut Off 2025 &#8211; Zone Wise"}]},{"@type":"WebSite","@id":"https:\/\/entri.app\/blog\/#website","url":"https:\/\/entri.app\/blog\/","name":"Entri Blog","description":"","publisher":{"@id":"https:\/\/entri.app\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/entri.app\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/entri.app\/blog\/#organization","name":"Entri App","url":"https:\/\/entri.app\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png","contentUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png","width":989,"height":446,"caption":"Entri App"},"image":{"@id":"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/entri.me\/","https:\/\/x.com\/entri_app"]},{"@type":"Person","@id":"https:\/\/entri.app\/blog\/#\/schema\/person\/76260ad43c26c5230e8ad1f11ba1fc30","name":"Sreesha V.S","description":"Sreesha is a professional content writer with over 4 years of experience in the industry. She specializes in writing copy for websites, blogs, social media advertisements, Wikipedia, and other digital news content. Her expertise lies in crafting high-quality content on various topics such as education, business, finance, lifestyle, and health. Over the years, Sreesha has worked on nearly 700+ articles, several website copies, social media ads, and even a Wikipedia page. Sreesha holds a Master's degree in Journalism and Mass Communication from Kannur University, where she specialized in areas such as multimedia journalism, print media, and advertising.","sameAs":["https:\/\/entri.app\/","https:\/\/www.linkedin.com\/in\/sreesha-v-s-2263a71bb"],"url":"https:\/\/entri.app\/blog\/author\/sreesha\/"}]}},"_links":{"self":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25605603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/users\/115"}],"replies":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/comments?post=25605603"}],"version-history":[{"count":6,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25605603\/revisions"}],"predecessor-version":[{"id":25605612,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25605603\/revisions\/25605612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/media\/25605606"}],"wp:attachment":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/media?parent=25605603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/categories?post=25605603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/tags?post=25605603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}