{"id":25608475,"date":"2025-04-17T22:13:26","date_gmt":"2025-04-17T16:43:26","guid":{"rendered":"https:\/\/entri.app\/blog\/?p=25608475"},"modified":"2025-04-23T13:35:34","modified_gmt":"2025-04-23T08:05:34","slug":"joint-measurement-sheet","status":"publish","type":"post","link":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/","title":{"rendered":"What is a Joint Measurement Sheet?"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_79_2 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<label for=\"ez-toc-cssicon-toggle-item-69d35f8c8d1ed\" class=\"ez-toc-cssicon-toggle-label\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/label><input type=\"checkbox\"  id=\"ez-toc-cssicon-toggle-item-69d35f8c8d1ed\"  aria-label=\"Toggle\" \/><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#What_is_a_Joint_Measurement_Sheet\" >What is a Joint Measurement Sheet?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#Importance_of_accurate_joint_measurement\" >Importance of accurate joint measurement<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#Step-by-step_guide_to_recording_joint_quantities\" >Step-by-step guide to recording joint quantities<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#Best_practices_for_ensuring_accuracy\" >Best practices for ensuring accuracy<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#Conclusion\" >Conclusion<\/a><\/li><\/ul><\/nav><\/div>\n<p>In a world of construction and infrastructure projects, transparency, accuracy and mutual agreement play an important role in even execution and timely payment. This is where a joint measurement letter (JMS) becomes an essential document. A JMS is a collaborative work plate that describes the measurement of the work completed on a website. It is jointly confirmed and signed by both the contractor and the customer or their representatives, and provides a reliable basis for invoicing and project tracking. Whether you are a civil engineer, volume gauge or project manager, it is important to understand the purpose and format of a common measurement sheet for effective project management and financial accuracy<\/p>\n<p style=\"text-align: center;\"><strong><a href=\"https:\/\/entri.app\/course\/quantity-surveying-course\/?utm_source=quantity-surveying&amp;utm_medium=blog_referral&amp;utm_campaign=best-quantity-surveying-blogs-to-follow\"><span data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;\\&quot;Get hands-on with our data science and machine learning course - sign up for a free demo!\\&quot;&quot;}\" data-sheets-userformat=\"{&quot;2&quot;:14915,&quot;3&quot;:{&quot;1&quot;:0},&quot;4&quot;:{&quot;1&quot;:2,&quot;2&quot;:16316664},&quot;9&quot;:0,&quot;12&quot;:0,&quot;14&quot;:{&quot;1&quot;:2,&quot;2&quot;:1907741},&quot;15&quot;:&quot;Arial&quot;,&quot;16&quot;:10}\">Get hands-on with our Quantity Surveyor course \u2013 sign up for a free demo!<\/span><\/a><\/strong><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_is_a_Joint_Measurement_Sheet\"><\/span><span data-sheets-root=\"1\"><strong>What is a Joint Measurement Sheet?<\/strong><br \/>\n<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p class=\"\" data-start=\"0\" data-end=\"442\">A <strong data-start=\"2\" data-end=\"35\">Joint Measurement Sheet (JMS)<\/strong> is a document used in design and civil engineering projects, which is to register the actual amount of work done on site. It is jointly prepared, verified and signed by representatives of both the contractor and the customer (or project advisor). The purpose of a JMS is to ensure that it is a mutual agreement to measure complete work before increasing the bill or processing of payment.<\/p>\n<h3 class=\"\" data-start=\"444\" data-end=\"490\"><strong>Key Features of a Joint Measurement Sheet:<\/strong><\/h3>\n<ul data-start=\"491\" data-end=\"832\">\n<li class=\"\" data-start=\"491\" data-end=\"588\">\n<p class=\"\" data-start=\"493\" data-end=\"588\"><strong data-start=\"493\" data-end=\"518\">Collaborative process<\/strong>: Measurements are taken and recorded in the presence of both parties.<\/p>\n<\/li>\n<li class=\"\" data-start=\"589\" data-end=\"667\">\n<p class=\"\" data-start=\"591\" data-end=\"667\"><strong data-start=\"591\" data-end=\"603\">Accuracy<\/strong>: Prevents disputes by providing a clear and agreed-upon record.<\/p>\n<\/li>\n<li class=\"\" data-start=\"668\" data-end=\"751\">\n<p class=\"\" data-start=\"670\" data-end=\"751\"><strong data-start=\"670\" data-end=\"689\">Billing support<\/strong>: Acts as the basis for interim or final payment certificates.<\/p>\n<\/li>\n<li class=\"\" data-start=\"752\" data-end=\"832\">\n<p class=\"\" data-start=\"754\" data-end=\"832\"><strong data-start=\"754\" data-end=\"774\">Project tracking<\/strong>: Helps monitor the progress of work against the schedule.<\/p>\n<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Importance_of_accurate_joint_measurement\"><\/span><span data-sheets-root=\"1\"><strong>Importance of accurate joint measurement<\/strong><br \/>\n<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p class=\"\" data-start=\"195\" data-end=\"449\">Exact joint measurement is the cornerstone of successful construction project management. This not only ensures openness, but also promotes trust and responsibility between stakeholders. Here, accuracy in joint measurement is seriously important:<\/p>\n<p data-start=\"195\" data-end=\"449\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/Importance-of-accurate-joint-measurement-visual-selection.webp\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-25609047 size-full\" src=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/Importance-of-accurate-joint-measurement-visual-selection.webp\" alt=\"Importance of accurate joint measurement - visual selection\" width=\"1008\" height=\"570\" srcset=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/Importance-of-accurate-joint-measurement-visual-selection.webp 1008w, https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/Importance-of-accurate-joint-measurement-visual-selection-300x170.webp 300w, https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/Importance-of-accurate-joint-measurement-visual-selection-768x434.webp 768w, https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/Importance-of-accurate-joint-measurement-visual-selection-150x85.webp 150w, https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/Importance-of-accurate-joint-measurement-visual-selection-750x424.webp 750w\" sizes=\"auto, (max-width: 1008px) 100vw, 1008px\" \/><\/a><\/p>\n<h4 class=\"\" data-start=\"456\" data-end=\"499\">1. <strong data-start=\"464\" data-end=\"499\">Prevents Disputes and Conflicts<\/strong><\/h4>\n<p class=\"\" data-start=\"500\" data-end=\"812\">One of the biggest benefits of accurate joint measurement is that it reduces disagreement between contractors and customers. Since both sides are involved in measuring and verifying the work, there is a shared understanding of what has been done, which is very less space for volume or invoicing disputes.<\/p>\n<h4 class=\"\" data-start=\"819\" data-end=\"868\">2. <strong data-start=\"827\" data-end=\"868\">Ensures Fair and Transparent Payments<\/strong><\/h4>\n<p class=\"\" data-start=\"869\" data-end=\"1200\">Accurate joint measurement forms the basis for generating contractor bills. If the measurements are incorrect, the payment may either be unfair to the contractor (underpayment) or to the client (overpayment). A precise JMS ensures that the contractor is paid exactly for the work done, maintaining fairness and financial integrity.<\/p>\n<h4 class=\"\" data-start=\"1207\" data-end=\"1255\">3. <strong data-start=\"1215\" data-end=\"1255\">Supports Project Progress Monitoring<\/strong><\/h4>\n<p class=\"\" data-start=\"1256\" data-end=\"1493\">With regular and correct joint measurements, undertaking managers can carefully song the development of the paintings. It enables in evaluating the real paintings completed towards the deliberate agenda and figuring out any delays or discrepancies early on.<\/p>\n<h4 class=\"\" data-start=\"1500\" data-end=\"1537\">4. <strong data-start=\"1508\" data-end=\"1537\">Aids in Quality Assurance<\/strong><\/h4>\n<p class=\"\" data-start=\"1538\" data-end=\"1769\">Accurate joint measurement regularly is going hand-in-hand with website inspections. During the procedure, engineers and supervisors also can take a look at the best of the completed work, ensuring it aligns with undertaking specs and standards.<\/p>\n<h4 class=\"\" data-start=\"1776\" data-end=\"1839\">5. <strong data-start=\"1784\" data-end=\"1839\">Forms the Basis for Certification and Final Billing<\/strong><\/h4>\n<p class=\"\" data-start=\"1840\" data-end=\"2104\">Before the issuance of interim or final payment certificates, joint measurements serve as official documentation to justify the quantities claimed by the contractor. Without this documentation, it becomes challenging for clients or consultants to certify payments.<\/p>\n<h4 class=\"\" data-start=\"2111\" data-end=\"2150\">6. <strong data-start=\"2119\" data-end=\"2150\">Legal and Contractual Value<\/strong><\/h4>\n<p class=\"\" data-start=\"2151\" data-end=\"2377\">In the case of audits or legal disputes, a well-maintained Joint Measurement Sheet acts as solid evidence. It shows that both parties agreed to the recorded work quantities, which can help resolve claims or contractual issues.<\/p>\n<h4 class=\"\" data-start=\"2384\" data-end=\"2439\">7. <strong data-start=\"2392\" data-end=\"2439\">Improves Accountability and Professionalism<\/strong><\/h4>\n<p class=\"\" data-start=\"2440\" data-end=\"2648\">When both parties are required to jointly take and sign off on measurements, it encourages a more professional approach to record-keeping. It holds all stakeholders accountable for their roles in the project.<\/p>\n<p style=\"text-align: center;\" data-start=\"2440\" data-end=\"2648\"><strong><a href=\"https:\/\/entri.app\/course\/quantity-surveying-course\/?utm_source=quantity-surveying&amp;utm_medium=blog_referral&amp;utm_campaign=best-quantity-surveying-blogs-to-follow\"><span data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;\\&quot;Get hands-on with our data science and machine learning course - sign up for a free demo!\\&quot;&quot;}\" data-sheets-userformat=\"{&quot;2&quot;:14915,&quot;3&quot;:{&quot;1&quot;:0},&quot;4&quot;:{&quot;1&quot;:2,&quot;2&quot;:16316664},&quot;9&quot;:0,&quot;12&quot;:0,&quot;14&quot;:{&quot;1&quot;:2,&quot;2&quot;:1907741},&quot;15&quot;:&quot;Arial&quot;,&quot;16&quot;:10}\">Get hands-on with our Quantity Surveyor course \u2013 sign up for a free demo!<\/span><\/a><\/strong><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step-by-step_guide_to_recording_joint_quantities\"><\/span><span data-sheets-root=\"1\"><strong>Step-by-step guide to recording joint quantities<\/strong><br \/>\n<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p class=\"\" data-start=\"207\" data-end=\"422\">Accurately recording joint quantities ensures fair billing, transparent project progress, and strong documentation. Here\u2019s a step-by-step guide to help you prepare and maintain a Joint Measurement Sheet effectively:<\/p>\n<h4 class=\"\" data-start=\"429\" data-end=\"469\"><strong data-start=\"434\" data-end=\"469\">Step 1: Prepare for Measurement<\/strong><\/h4>\n<p class=\"\" data-start=\"470\" data-end=\"507\">Before starting any measurement work:<\/p>\n<ul data-start=\"509\" data-end=\"928\">\n<li class=\"\" data-start=\"509\" data-end=\"636\">\n<p class=\"\" data-start=\"511\" data-end=\"636\"><strong data-start=\"511\" data-end=\"538\">Notify all stakeholders<\/strong>: Inform the contractor, client, and site engineer in advance so that both parties can be present.<\/p>\n<\/li>\n<li class=\"\" data-start=\"637\" data-end=\"831\">\n<p class=\"\" data-start=\"639\" data-end=\"831\"><strong data-start=\"639\" data-end=\"669\">Gather tools and documents<\/strong>: Bring along measuring tapes, digital distance meters, drawing plans, specifications, previous JMS records (if any), and notebooks or printed formats of the JMS.<\/p>\n<\/li>\n<li class=\"\" data-start=\"832\" data-end=\"928\">\n<p class=\"\" data-start=\"834\" data-end=\"928\"><strong data-start=\"834\" data-end=\"851\">Ensure safety<\/strong>: Check site conditions and make sure it is safe for the measurement process.<\/p>\n<\/li>\n<\/ul>\n<h4 class=\"\" data-start=\"935\" data-end=\"992\"><strong data-start=\"940\" data-end=\"992\">Step 2: Identify the Area of Work to Be Measured<\/strong><\/h4>\n<p class=\"\" data-start=\"993\" data-end=\"1089\">Clearly define and mark the specific section or element of work that needs measurement, such as:<\/p>\n<ul data-start=\"1091\" data-end=\"1191\">\n<li class=\"\" data-start=\"1091\" data-end=\"1113\">\n<p class=\"\" data-start=\"1093\" data-end=\"1113\">Earthwork excavation<\/p>\n<\/li>\n<li class=\"\" data-start=\"1114\" data-end=\"1130\">\n<p class=\"\" data-start=\"1116\" data-end=\"1130\">Concrete slabs<\/p>\n<\/li>\n<li class=\"\" data-start=\"1131\" data-end=\"1146\">\n<p class=\"\" data-start=\"1133\" data-end=\"1146\">Brick masonry<\/p>\n<\/li>\n<li class=\"\" data-start=\"1147\" data-end=\"1171\">\n<p class=\"\" data-start=\"1149\" data-end=\"1171\">Plastering or painting<\/p>\n<\/li>\n<li class=\"\" data-start=\"1172\" data-end=\"1191\">\n<p class=\"\" data-start=\"1174\" data-end=\"1191\">Road paving, etc.<\/p>\n<\/li>\n<\/ul>\n<p class=\"\" data-start=\"1193\" data-end=\"1283\">Refer to the approved construction drawings and work schedule to match the area completed.<\/p>\n<h4 class=\"\" data-start=\"1290\" data-end=\"1331\"><strong data-start=\"1295\" data-end=\"1331\">Step 3: Measure the Work Jointly<\/strong><\/h4>\n<ul data-start=\"1332\" data-end=\"1674\">\n<li class=\"\" data-start=\"1332\" data-end=\"1426\">\n<p class=\"\" data-start=\"1334\" data-end=\"1426\">Measurements should be taken jointly by both parties (client\/consultant and contractor).<\/p>\n<\/li>\n<li class=\"\" data-start=\"1427\" data-end=\"1506\">\n<p class=\"\" data-start=\"1429\" data-end=\"1506\">Use standard measurement methods (as per IS codes or contract documents).<\/p>\n<\/li>\n<li class=\"\" data-start=\"1507\" data-end=\"1582\">\n<p class=\"\" data-start=\"1509\" data-end=\"1582\">Note down the length, breadth, height, and other relevant dimensions.<\/p>\n<\/li>\n<li class=\"\" data-start=\"1583\" data-end=\"1674\">\n<p class=\"\" data-start=\"1585\" data-end=\"1674\">If the area includes deductions (e.g., window openings), measure and record them as well.<\/p>\n<\/li>\n<\/ul>\n<h4 class=\"\" data-start=\"1681\" data-end=\"1721\"><strong data-start=\"1686\" data-end=\"1721\">Step 4: Record the Measurements<\/strong><\/h4>\n<p class=\"\" data-start=\"1722\" data-end=\"1809\">Enter the measured data into the Joint Measurement Sheet, which typically includes:<\/p>\n<ul data-start=\"1811\" data-end=\"2000\">\n<li class=\"\" data-start=\"1811\" data-end=\"1828\">\n<p class=\"\" data-start=\"1813\" data-end=\"1828\">Serial Number<\/p>\n<\/li>\n<li class=\"\" data-start=\"1829\" data-end=\"1852\">\n<p class=\"\" data-start=\"1831\" data-end=\"1852\">Description of Work<\/p>\n<\/li>\n<li class=\"\" data-start=\"1853\" data-end=\"1874\">\n<p class=\"\" data-start=\"1855\" data-end=\"1874\">Drawing Reference<\/p>\n<\/li>\n<li class=\"\" data-start=\"1875\" data-end=\"1926\">\n<p class=\"\" data-start=\"1877\" data-end=\"1926\">Measurement Details (Length \u00d7 Breadth \u00d7 Height)<\/p>\n<\/li>\n<li class=\"\" data-start=\"1927\" data-end=\"1979\">\n<p class=\"\" data-start=\"1929\" data-end=\"1979\">Quantity (in appropriate unit like m\u00b3, m\u00b2, etc.)<\/p>\n<\/li>\n<li class=\"\" data-start=\"1980\" data-end=\"2000\">\n<p class=\"\" data-start=\"1982\" data-end=\"2000\">Remarks (if any)<\/p>\n<\/li>\n<\/ul>\n<p class=\"\" data-start=\"2002\" data-end=\"2010\">Example:<\/p>\n<div class=\"group pointer-events-none relative flex justify-center *:pointer-events-auto\">\n<div class=\"tableContainer horzScrollShadows relative\">\n<table class=\"min-w-full\" data-start=\"2011\" data-end=\"2265\">\n<thead data-start=\"2011\" data-end=\"2094\">\n<tr data-start=\"2011\" data-end=\"2094\">\n<th data-start=\"2011\" data-end=\"2018\">S.No<\/th>\n<th data-start=\"2018\" data-end=\"2039\">Description<\/th>\n<th data-start=\"2039\" data-end=\"2047\">L (m)<\/th>\n<th data-start=\"2047\" data-end=\"2055\">B (m)<\/th>\n<th data-start=\"2055\" data-end=\"2063\">H (m)<\/th>\n<th data-start=\"2063\" data-end=\"2079\">Quantity (m\u00b3)<\/th>\n<th data-start=\"2079\" data-end=\"2094\">Remarks<\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"2180\" data-end=\"2265\">\n<tr data-start=\"2180\" data-end=\"2265\">\n<td class=\"max-w-[calc(var(--thread-content-max-width)*2\/3)]\" data-start=\"2180\" data-end=\"2187\">1<\/td>\n<td class=\"max-w-[calc(var(--thread-content-max-width)*2\/3)]\" data-start=\"2187\" data-end=\"2208\">Brickwork (Wall A)<\/td>\n<td class=\"max-w-[calc(var(--thread-content-max-width)*2\/3)]\" data-start=\"2208\" data-end=\"2216\">10.00<\/td>\n<td class=\"max-w-[calc(var(--thread-content-max-width)*2\/3)]\" data-start=\"2216\" data-end=\"2224\">0.23<\/td>\n<td class=\"max-w-[calc(var(--thread-content-max-width)*2\/3)]\" data-start=\"2224\" data-end=\"2232\">3.00<\/td>\n<td class=\"max-w-[calc(var(--thread-content-max-width)*2\/3)]\" data-start=\"2232\" data-end=\"2249\">6.90<\/td>\n<td class=\"max-w-[calc(var(--thread-content-max-width)*2\/3)]\" data-start=\"2249\" data-end=\"2265\">As per DWG#2<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"epyt-video-wrapper\"><iframe loading=\"lazy\"  style=\"display: block; margin: 0px auto;\"  id=\"_ytid_35049\"  width=\"480\" height=\"270\"  data-origwidth=\"480\" data-origheight=\"270\"  data-relstop=\"1\" src=\"https:\/\/www.youtube.com\/embed\/mo5_hzGiQ9E?enablejsapi=1&#038;autoplay=0&#038;cc_load_policy=0&#038;cc_lang_pref=&#038;iv_load_policy=1&#038;loop=0&#038;rel=0&#038;fs=0&#038;playsinline=1&#038;autohide=2&#038;theme=dark&#038;color=red&#038;controls=1&#038;disablekb=0&#038;\" class=\"__youtube_prefs__  epyt-is-override  no-lazyload\" title=\"YouTube player\"  allow=\"fullscreen; accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen data-no-lazy=\"1\" data-skipgform_ajax_framebjll=\"\"><\/iframe><\/div>\n<\/div>\n<\/div>\n<h4 class=\"\" data-start=\"2272\" data-end=\"2311\"><strong data-start=\"2277\" data-end=\"2311\">Step 5: Verify and Cross-Check<\/strong><\/h4>\n<p class=\"\" data-start=\"2312\" data-end=\"2337\">Once the data is entered:<\/p>\n<ul data-start=\"2339\" data-end=\"2504\">\n<li class=\"\" data-start=\"2339\" data-end=\"2371\">\n<p class=\"\" data-start=\"2341\" data-end=\"2371\">Double-check all calculations.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2372\" data-end=\"2440\">\n<p class=\"\" data-start=\"2374\" data-end=\"2440\">Ensure the recorded quantities align with the actual on-site work.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2441\" data-end=\"2504\">\n<p class=\"\" data-start=\"2443\" data-end=\"2504\">Compare with drawings and specifications to confirm accuracy.<\/p>\n<\/li>\n<\/ul>\n<h4 class=\"\" data-start=\"2511\" data-end=\"2545\"><strong data-start=\"2516\" data-end=\"2545\">Step 6: Obtain Signatures<\/strong><\/h4>\n<p class=\"\" data-start=\"2546\" data-end=\"2601\">After both parties are satisfied with the measurements:<\/p>\n<ul data-start=\"2603\" data-end=\"2824\">\n<li class=\"\" data-start=\"2603\" data-end=\"2645\">\n<p class=\"\" data-start=\"2605\" data-end=\"2645\">Sign the JMS at the bottom of the sheet.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2646\" data-end=\"2750\">\n<p class=\"\" data-start=\"2648\" data-end=\"2750\">Include the date, names, and designations of those signing (e.g., Site Engineer, Project Manager).<\/p>\n<\/li>\n<li class=\"\" data-start=\"2751\" data-end=\"2824\">\n<p class=\"\" data-start=\"2753\" data-end=\"2824\">Each party should retain a signed copy of the document for records.<\/p>\n<\/li>\n<\/ul>\n<h4 class=\"\" data-start=\"2831\" data-end=\"2885\"><strong data-start=\"2836\" data-end=\"2885\">Step 7: Use JMS for Billing and Documentation<\/strong><\/h4>\n<p class=\"\" data-start=\"2886\" data-end=\"2926\">The completed and signed JMS can now be:<\/p>\n<ul data-start=\"2928\" data-end=\"3152\">\n<li class=\"\" data-start=\"2928\" data-end=\"2997\">\n<p class=\"\" data-start=\"2930\" data-end=\"2997\">Used to generate Running Account (RA) bills or final bills.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2998\" data-end=\"3109\">\n<p class=\"\" data-start=\"3000\" data-end=\"3109\">Submitted along with supporting documents like site photographs, progress reports, and material invoices.<\/p>\n<\/li>\n<li class=\"\" data-start=\"3110\" data-end=\"3152\">\n<p class=\"\" data-start=\"3112\" data-end=\"3152\">Stored for audit and legal purposes.<\/p>\n<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Best_practices_for_ensuring_accuracy\"><\/span><span data-sheets-root=\"1\"><strong>Best practices for ensuring accuracy<\/strong><br \/>\n<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p class=\"\" data-start=\"197\" data-end=\"456\">Accurate joint measurements are important for honest billing, clean communique, and keeping professional integrity on production websites. Here are some fine practices to make sure precision and avoid errors while making ready Joint Measurement Sheets (JMS):<\/p>\n<h4 class=\"\" data-start=\"463\" data-end=\"521\"><strong data-start=\"468\" data-end=\"521\">1. Always Measure in the Presence of Both Parties<\/strong><\/h4>\n<p class=\"\" data-start=\"522\" data-end=\"751\">Ensure that each the contractor\u2019s consultant and the purchaser\u2019s\/website engineer or consultant are bodily present all through the dimension process. This reduces the threat of disputes afterward and ensures mutual agreement.<\/p>\n<h4 class=\"\" data-start=\"758\" data-end=\"813\"><strong data-start=\"763\" data-end=\"813\">2. Use Calibrated and Reliable Measuring Tools<\/strong><\/h4>\n<p class=\"\" data-start=\"814\" data-end=\"1047\">Always use equipment like metal measuring tapes, digital laser distance meters, and ranges which can be nicely calibrated and in desirable situation. Faulty equipment can result in inaccurate measurements, affecting billing and development tracking.<\/p>\n<h4 class=\"\" data-start=\"1054\" data-end=\"1101\"><strong data-start=\"1059\" data-end=\"1101\">3. Cross-Verify With Approved Drawings<\/strong><\/h4>\n<p class=\"\" data-start=\"1102\" data-end=\"1302\">Before starting, review the latest approved construction drawings to understand dimensions, locations, and specifications. All measurements should align with these drawings to avoid discrepancies.<\/p>\n<h4 class=\"\" data-start=\"1309\" data-end=\"1355\"><strong data-start=\"1314\" data-end=\"1355\">4. Record Details Immediately on Site<\/strong><\/h4>\n<p class=\"\" data-start=\"1356\" data-end=\"1533\">Enter measurements into the Joint Measurement Sheet immediately and on-site, not after the fact. Delays in recording can lead to forgotten or incorrectly assumed dimensions.<\/p>\n<h4 class=\"\" data-start=\"1540\" data-end=\"1584\"><strong data-start=\"1545\" data-end=\"1584\">5. Avoid Estimations or Assumptions<\/strong><\/h4>\n<p class=\"\" data-start=\"1585\" data-end=\"1748\">Never guess or estimate quantities. If measurements can\u2019t be taken for any reason (like work being inaccessible), clearly note the reason and schedule a follow-up.<\/p>\n<h4 class=\"\" data-start=\"1755\" data-end=\"1813\"><strong data-start=\"1760\" data-end=\"1813\">6. Include Deductions and Additions Transparently<\/strong><\/h4>\n<p class=\"\" data-start=\"1814\" data-end=\"1993\">Clearly record deductions for openings (e.g., windows, doors) and additions like extra thickness or overlaps. Make sure to justify any unusual entries in the &#8220;Remarks&#8221; column.<\/p>\n<h4 class=\"\" data-start=\"2000\" data-end=\"2042\"><strong data-start=\"2005\" data-end=\"2042\">7. Use Standard Measurement Codes<\/strong><\/h4>\n<p class=\"\" data-start=\"2043\" data-end=\"2207\">Follow standard measurement methods (e.g., IS 1200 series in India or contract-specific guidelines). This ensures uniformity and legality in your documentation.<\/p>\n<h4 class=\"\" data-start=\"2214\" data-end=\"2264\"><strong data-start=\"2219\" data-end=\"2264\">8. Take Photographs with Measurement Tags<\/strong><\/h4>\n<p class=\"\" data-start=\"2265\" data-end=\"2427\">Use photographs to document completed work along with measurement tapes or digital tags visible in the image. Attach them with the JMS as supporting evidence.<\/p>\n<h4 class=\"\" data-start=\"2434\" data-end=\"2470\"><strong data-start=\"2439\" data-end=\"2470\">9. Maintain Version Control<\/strong><\/h4>\n<p class=\"\" data-start=\"2471\" data-end=\"2674\">If you make any changes to previously recorded quantities, strike through the incorrect data, add a remark explaining the change, and do not erase it. Use a new sheet or create a revision, and then have both the contractor and customer re-sign it with a clear reference to the previous version.<\/p>\n<h4 class=\"\" data-start=\"2681\" data-end=\"2727\"><strong data-start=\"2686\" data-end=\"2727\">10. Ensure Proper Review and Sign-Off<\/strong><\/h4>\n<p class=\"\" data-start=\"2728\" data-end=\"2927\">Once the sheet is filled, double-check calculations, validate each entry, and ensure signatures, names, and dates are recorded. A JMS without signatures holds little legal or practical value.<\/p>\n<p style=\"text-align: center;\" data-start=\"2728\" data-end=\"2927\"><strong><a href=\"https:\/\/entri.app\/course\/quantity-surveying-course\/?utm_source=quantity-surveying&amp;utm_medium=blog_referral&amp;utm_campaign=best-quantity-surveying-blogs-to-follow\"><span data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;\\&quot;Get hands-on with our data science and machine learning course - sign up for a free demo!\\&quot;&quot;}\" data-sheets-userformat=\"{&quot;2&quot;:14915,&quot;3&quot;:{&quot;1&quot;:0},&quot;4&quot;:{&quot;1&quot;:2,&quot;2&quot;:16316664},&quot;9&quot;:0,&quot;12&quot;:0,&quot;14&quot;:{&quot;1&quot;:2,&quot;2&quot;:1907741},&quot;15&quot;:&quot;Arial&quot;,&quot;16&quot;:10}\">Get hands-on with our Quantity Surveyor course \u2013 sign up for a free demo!<\/span><\/a><\/strong><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p class=\"\" data-start=\"122\" data-end=\"500\">A Joint Measurement Sheet (JMS) exceeds only one technical document &#8211; it is an important tool for maintaining openness, accuracy and responsibility in construction projects. By ensuring that the contractor and the customer jointly confirm and register all measured work, JMS acts as a regular base between them, reduces the risk of disputes, and ensures fair invoicing.<\/p>\n<p class=\"\" data-start=\"502\" data-end=\"859\">Whether you are a website engineer, contractor or project manager, to understand how to prepare yourself accurately and maintain a JMS, it is necessary for even project execution. By following best practices, using appropriate equipment and ensuring timely documentation, you can create a valuable property for quality control, project tracking and financial clarity in the JMS process.<\/p>\n<table class=\"table\">\n<tbody>\n<tr>\n<td colspan=\"2\"><b>Related Links<\/b><\/td>\n<\/tr>\n<tr>\n<td><strong><a href=\"https:\/\/entri.app\/blog\/how-to-get-international-client-as-freelance-quantity-surveyor\/\" target=\"_blank\" rel=\"noopener\">How to Get International Clients as a Freelance Quantity Surveyor<\/a><\/strong><\/td>\n<td><a href=\"https:\/\/entri.app\/blog\/best-quantity-surveying-blogs-to-follow\/\" target=\"_blank\" rel=\"noopener\"><strong>Best Quantity Surveying Blogs and Websites<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>In a world of construction and infrastructure projects, transparency, accuracy and mutual agreement play an important role in even execution and timely payment. This is where a joint measurement letter (JMS) becomes an essential document. A JMS is a collaborative work plate that describes the measurement of the work completed on a website. It is [&hellip;]<\/p>\n","protected":false},"author":100,"featured_media":25608477,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[802,1927],"tags":[],"class_list":["post-25608475","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles","category-quantity-surveying"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What is a Joint Measurement Sheet? - Entri Blog<\/title>\n<meta name=\"description\" content=\"Understand what a Joint Measurement Sheet is, its purpose in construction, and how it&#039;s used for accurate quantity assessment. Scroll down!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is a Joint Measurement Sheet? - Entri Blog\" \/>\n<meta property=\"og:description\" content=\"Understand what a Joint Measurement Sheet is, its purpose in construction, and how it&#039;s used for accurate quantity assessment. Scroll down!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/\" \/>\n<meta property=\"og:site_name\" content=\"Entri Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/entri.me\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-17T16:43:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-23T08:05:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"820\" \/>\n\t<meta property=\"og:image:height\" content=\"615\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Sabira Ulfath\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@entri_app\" \/>\n<meta name=\"twitter:site\" content=\"@entri_app\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sabira Ulfath\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/\"},\"author\":{\"name\":\"Sabira Ulfath\",\"@id\":\"https:\/\/entri.app\/blog\/#\/schema\/person\/c79ea15b3ee5dab855ebea929c9a6046\"},\"headline\":\"What is a Joint Measurement Sheet?\",\"datePublished\":\"2025-04-17T16:43:26+00:00\",\"dateModified\":\"2025-04-23T08:05:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/\"},\"wordCount\":1547,\"publisher\":{\"@id\":\"https:\/\/entri.app\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp\",\"articleSection\":[\"Articles\",\"Quantity Surveying\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/\",\"url\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/\",\"name\":\"What is a Joint Measurement Sheet? - Entri Blog\",\"isPartOf\":{\"@id\":\"https:\/\/entri.app\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp\",\"datePublished\":\"2025-04-17T16:43:26+00:00\",\"dateModified\":\"2025-04-23T08:05:34+00:00\",\"description\":\"Understand what a Joint Measurement Sheet is, its purpose in construction, and how it's used for accurate quantity assessment. Scroll down!\",\"breadcrumb\":{\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#primaryimage\",\"url\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp\",\"contentUrl\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp\",\"width\":820,\"height\":615,\"caption\":\"What is a Joint Measurement Sheet?\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/entri.app\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Entri Skilling\",\"item\":\"https:\/\/entri.app\/blog\/category\/entri-skilling\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Quantity Surveying\",\"item\":\"https:\/\/entri.app\/blog\/category\/entri-skilling\/quantity-surveying\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"What is a Joint Measurement Sheet?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/entri.app\/blog\/#website\",\"url\":\"https:\/\/entri.app\/blog\/\",\"name\":\"Entri Blog\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/entri.app\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/entri.app\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/entri.app\/blog\/#organization\",\"name\":\"Entri App\",\"url\":\"https:\/\/entri.app\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png\",\"contentUrl\":\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png\",\"width\":989,\"height\":446,\"caption\":\"Entri App\"},\"image\":{\"@id\":\"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/entri.me\/\",\"https:\/\/x.com\/entri_app\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/entri.app\/blog\/#\/schema\/person\/c79ea15b3ee5dab855ebea929c9a6046\",\"name\":\"Sabira Ulfath\",\"url\":\"https:\/\/entri.app\/blog\/author\/sabira\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What is a Joint Measurement Sheet? - Entri Blog","description":"Understand what a Joint Measurement Sheet is, its purpose in construction, and how it's used for accurate quantity assessment. Scroll down!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/","og_locale":"en_US","og_type":"article","og_title":"What is a Joint Measurement Sheet? - Entri Blog","og_description":"Understand what a Joint Measurement Sheet is, its purpose in construction, and how it's used for accurate quantity assessment. Scroll down!","og_url":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/","og_site_name":"Entri Blog","article_publisher":"https:\/\/www.facebook.com\/entri.me\/","article_published_time":"2025-04-17T16:43:26+00:00","article_modified_time":"2025-04-23T08:05:34+00:00","og_image":[{"width":820,"height":615,"url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp","type":"image\/webp"}],"author":"Sabira Ulfath","twitter_card":"summary_large_image","twitter_creator":"@entri_app","twitter_site":"@entri_app","twitter_misc":{"Written by":"Sabira Ulfath","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#article","isPartOf":{"@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/"},"author":{"name":"Sabira Ulfath","@id":"https:\/\/entri.app\/blog\/#\/schema\/person\/c79ea15b3ee5dab855ebea929c9a6046"},"headline":"What is a Joint Measurement Sheet?","datePublished":"2025-04-17T16:43:26+00:00","dateModified":"2025-04-23T08:05:34+00:00","mainEntityOfPage":{"@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/"},"wordCount":1547,"publisher":{"@id":"https:\/\/entri.app\/blog\/#organization"},"image":{"@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#primaryimage"},"thumbnailUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp","articleSection":["Articles","Quantity Surveying"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/","url":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/","name":"What is a Joint Measurement Sheet? - Entri Blog","isPartOf":{"@id":"https:\/\/entri.app\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#primaryimage"},"image":{"@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#primaryimage"},"thumbnailUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp","datePublished":"2025-04-17T16:43:26+00:00","dateModified":"2025-04-23T08:05:34+00:00","description":"Understand what a Joint Measurement Sheet is, its purpose in construction, and how it's used for accurate quantity assessment. Scroll down!","breadcrumb":{"@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/entri.app\/blog\/joint-measurement-sheet\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#primaryimage","url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp","contentUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2025\/04\/What-is-a-Joint-Measurement-Sheet.webp","width":820,"height":615,"caption":"What is a Joint Measurement Sheet?"},{"@type":"BreadcrumbList","@id":"https:\/\/entri.app\/blog\/joint-measurement-sheet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/entri.app\/blog\/"},{"@type":"ListItem","position":2,"name":"Entri Skilling","item":"https:\/\/entri.app\/blog\/category\/entri-skilling\/"},{"@type":"ListItem","position":3,"name":"Quantity Surveying","item":"https:\/\/entri.app\/blog\/category\/entri-skilling\/quantity-surveying\/"},{"@type":"ListItem","position":4,"name":"What is a Joint Measurement Sheet?"}]},{"@type":"WebSite","@id":"https:\/\/entri.app\/blog\/#website","url":"https:\/\/entri.app\/blog\/","name":"Entri Blog","description":"","publisher":{"@id":"https:\/\/entri.app\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/entri.app\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/entri.app\/blog\/#organization","name":"Entri App","url":"https:\/\/entri.app\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png","contentUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png","width":989,"height":446,"caption":"Entri App"},"image":{"@id":"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/entri.me\/","https:\/\/x.com\/entri_app"]},{"@type":"Person","@id":"https:\/\/entri.app\/blog\/#\/schema\/person\/c79ea15b3ee5dab855ebea929c9a6046","name":"Sabira Ulfath","url":"https:\/\/entri.app\/blog\/author\/sabira\/"}]}},"_links":{"self":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25608475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/users\/100"}],"replies":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/comments?post=25608475"}],"version-history":[{"count":8,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25608475\/revisions"}],"predecessor-version":[{"id":25609167,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25608475\/revisions\/25609167"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/media\/25608477"}],"wp:attachment":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/media?parent=25608475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/categories?post=25608475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/tags?post=25608475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}