{"id":25663719,"date":"2026-10-23T10:19:39","date_gmt":"2026-10-23T04:49:39","guid":{"rendered":"https:\/\/entri.app\/blog\/?p=25663719"},"modified":"2026-10-23T10:30:02","modified_gmt":"2026-10-23T05:00:02","slug":"rrb-station-master-cut-off","status":"publish","type":"post","link":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/","title":{"rendered":"RRB Station Master Cut Off 2026 &#8211; Check Previous Year Cut Off Marks Details"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<label for=\"ez-toc-cssicon-toggle-item-6adaf7e3ec3bb\" class=\"ez-toc-cssicon-toggle-label\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/label><input type=\"checkbox\"  id=\"ez-toc-cssicon-toggle-item-6adaf7e3ec3bb\"  aria-label=\"Toggle\" \/><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#RRB_Station_Master_Recruitment_2026_Overview\" >RRB Station Master Recruitment 2026: Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#RRB_Station_Master_Cut_Off_%E2%80%93_Previous_Cycle_Details\" >RRB Station Master Cut Off &#8211; Previous Cycle Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#RRB_Station_Master_Minimum_Qualifying_Marks\" >RRB Station Master Minimum Qualifying Marks<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#RRB_Station_Master_CBT_1_Cut_Off_Zone-Wise_%E2%80%93_Previous\" >RRB Station Master CBT 1 Cut Off (Zone-Wise) &#8211; Previous<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#RRB_Station_Master_CBT_2_Cut_Off_for_CBAT_Shortlisting_%E2%80%93_Previous\" >RRB Station Master CBT 2 Cut Off for CBAT Shortlisting &#8211; Previous<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#RRB_Thiruvananthapuram_Station_Master_Cut_Off_Kerala_%E2%80%93_Previous\" >RRB Thiruvananthapuram Station Master Cut Off (Kerala) &#8211; Previous<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#How_the_Station_Master_Cut_Off_Is_Decided\" >How the Station Master Cut Off Is Decided<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#How_to_Check_the_RRB_Station_Master_Cut_Off\" >How to Check the RRB Station Master Cut Off<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#Is_Station_Master_Included_in_RRB_NTPC_2026\" >Is Station Master Included in RRB NTPC 2026?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#RRB_Station_Master_Short_Notice_Out\" >RRB Station Master Short Notice Out\u00a0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#Safe_score_to_target_for_Station_Master\" >Safe score to target for Station Master<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#RRB_Station_Master_Syllabus_2026\" >RRB Station Master Syllabus 2026<\/a><\/li><\/ul><\/nav><\/div>\n<p>The RRB Station Master CBT 1 cut off for the previous cycle (CEN 06\/2025) ranged from 73.42 (Guwahati) to 88.22 (Bhopal) for the UR category, out of 100 normalised marks. In RRB Thiruvananthapuram, the Kerala zone, the UR cut off was 77.80, OBC 75.45, EWS 72.42, SC 66.30 and ST 60.46.<\/p>\n<p>Station Master is one of the most sought-after posts in <a href=\"https:\/\/entri.app\/blog\/rrb-recruitment\/\" target=\"_blank\" rel=\"noopener\">RRB recruitment<\/a>. It is a Level 6 post with a starting basic pay of \u20b935,400, and selection runs through CBT 1, CBT 2 and a Computer Based Aptitude Test (CBAT). Each stage has its own cut off, released zone-wise and category-wise by each Railway Recruitment Board.<\/p>\n<p>This article covers the Station Master minimum qualifying marks, the zone-wise CBT 1 cut off, the CBT 2 cut off for CBAT shortlisting, and the score you should target.<\/p>\n<p style=\"text-align: center;\"><strong><a href=\"https:\/\/entri.app\/exam\/rrb-exams-coaching\/\" target=\"_blank\" rel=\"noopener\">Get Expert Guidance for RRB Exam Preparation! Free Demo Classes Here!<\/a><\/strong><\/p>\n<p><b>Quick answer:<\/b> To clear the <a href=\"https:\/\/entri.app\/blog\/rrb-station-master-notification\/\" target=\"_blank\" rel=\"noopener\">RRB Station Master<\/a> CBT 1 stage, UR candidates needed roughly 74\u201388 marks out of 100 depending on the zone. For CBAT shortlisting after CBT 2, UR cut offs ranged from about 71 to 82 (normalised).<\/p>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Station_Master_Recruitment_2026_Overview\"><\/span><strong>RRB Station Master Recruitment 2026: Overview<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<div>\n<div>\n<div class=\"table-responsive wprt_style_display\">\n<table class=\"table\">\n<tbody>\n<tr>\n<th>Particulars<\/th>\n<th>Details<\/th>\n<\/tr>\n<tr>\n<td>Recruiting Authority<\/td>\n<td>Railway Recruitment Boards (RRBs)<\/td>\n<\/tr>\n<tr>\n<td>Post Name<\/td>\n<td>Station Master<\/td>\n<\/tr>\n<tr>\n<td>Advertisement Number<\/td>\n<td>CEN 08\/2026<\/td>\n<\/tr>\n<tr>\n<td>Notification Status<\/td>\n<td>Short Notice Released<\/td>\n<\/tr>\n<tr>\n<td>Total Vacancies<\/td>\n<td>1,250 (Approximate)<\/td>\n<\/tr>\n<tr>\n<td>Educational Qualification<\/td>\n<td>Graduation<\/td>\n<\/tr>\n<tr>\n<td>Age Limit<\/td>\n<td>20\u201330 years<\/td>\n<\/tr>\n<tr>\n<td>Age Calculation Date<\/td>\n<td>1 January 2027<\/td>\n<\/tr>\n<tr>\n<td>Selection Process<\/td>\n<td>CBT, CBAT, Document Verification and Medical Examination<\/td>\n<\/tr>\n<tr>\n<td>Pay Level<\/td>\n<td>Level 6<\/td>\n<\/tr>\n<tr>\n<td>Initial Basic Pay<\/td>\n<td>\u20b935,400 per month<\/td>\n<\/tr>\n<tr>\n<td>Application Mode<\/td>\n<td>Online<\/td>\n<\/tr>\n<tr>\n<td>Application Start Date<\/td>\n<td>27 October 2026 (Tentative)<\/td>\n<\/tr>\n<tr>\n<td>Last Date to Apply<\/td>\n<td>25 November 2026 (Tentative)<\/td>\n<\/tr>\n<tr>\n<td>Official Application Website<\/td>\n<td><a href=\"https:\/\/www.rrbapply.gov.in\/\" target=\"_blank\" rel=\"noopener\">rrbapply.gov.in<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<\/div>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Station_Master_Cut_Off_%E2%80%93_Previous_Cycle_Details\"><\/span><b>RRB Station Master Cut Off &#8211; Previous Cycle Details<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>&nbsp;<\/p>\n<table cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\"><strong>Particulars<\/strong><\/td>\n<td valign=\"top\"><strong>Details<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Recruitment<\/td>\n<td valign=\"top\">RRB (Previous cycle it was under NTPC)<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Previous cycle with Station Master<\/td>\n<td valign=\"top\">CEN 06\/2025<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Station Master previous vacancies (CEN 06\/2025)<\/td>\n<td valign=\"top\">615<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Pay level<\/td>\n<td valign=\"top\">Level 6 (initial basic pay \u20b935,400)<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Selection stages<\/td>\n<td valign=\"top\">CBT 1 \u2192 CBT 2 \u2192 CBAT \u2192 Document Verification &amp; Medical<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">CBT 2 cut off released<\/td>\n<td valign=\"top\">27 August 2026<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Cut off type<\/td>\n<td valign=\"top\">Zone-wise, post-wise and category-wise (normalised marks)<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Negative marking<\/td>\n<td valign=\"top\">1\/3 mark per wrong answer<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Official website<\/td>\n<td valign=\"top\"><a href=\"https:\/\/rrb.indianrailways.gov.in\">rrb.indianrailways.gov.in<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Station_Master_Minimum_Qualifying_Marks\"><\/span><b>RRB Station Master Minimum Qualifying Marks<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Minimum qualifying marks are the lowest percentage a candidate must score to be considered at all. They are the same across every RRB zone. Actual cut offs are much higher, because shortlisting is done by merit against vacancies.<\/p>\n<table cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\">Category<\/td>\n<td valign=\"top\">Minimum Qualifying Marks<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">UR \/ EWS<\/td>\n<td valign=\"top\">40%<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">OBC (Non-Creamy Layer)<\/td>\n<td valign=\"top\">30%<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">SC<\/td>\n<td valign=\"top\">30%<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">ST<\/td>\n<td valign=\"top\">25%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>PwBD candidates may get a relaxation of 2 marks where there is a shortage of candidates.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Station_Master_CBT_1_Cut_Off_Zone-Wise_%E2%80%93_Previous\"><\/span><b>RRB Station Master CBT 1 Cut Off (Zone-Wise) &#8211; Previous<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Bhopal had the highest Station Master CBT 1 cut off at 88.22 for UR, and Guwahati the lowest at 73.42. The table shows the normalised CBT 1 marks (out of 100) of the last candidate shortlisted for CBT 2 under CEN 06\/2025. These are shortlisting marks, not final selection marks.<\/p>\n<table cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\">RRB Zone<\/td>\n<td valign=\"top\">UR<\/td>\n<td valign=\"top\">OBC<\/td>\n<td valign=\"top\">EWS<\/td>\n<td valign=\"top\">SC<\/td>\n<td valign=\"top\">ST<\/td>\n<td valign=\"top\">ESM<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bhopal<\/td>\n<td valign=\"top\">88.22<\/td>\n<td valign=\"top\">86.78<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">83.02<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">63.73<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Ranchi<\/td>\n<td valign=\"top\">87.06<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">84.55<\/td>\n<td valign=\"top\">76.35<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">62.81<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Ajmer<\/td>\n<td valign=\"top\">86.95<\/td>\n<td valign=\"top\">82.83<\/td>\n<td valign=\"top\">83.59<\/td>\n<td valign=\"top\">78.13<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">60.87<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bilaspur<\/td>\n<td valign=\"top\">86.15<\/td>\n<td valign=\"top\">83.53<\/td>\n<td valign=\"top\">83.56<\/td>\n<td valign=\"top\">78.16<\/td>\n<td valign=\"top\">74.02<\/td>\n<td valign=\"top\">60.81<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Malda<\/td>\n<td valign=\"top\">84.55<\/td>\n<td valign=\"top\">82.78<\/td>\n<td valign=\"top\">82.67<\/td>\n<td valign=\"top\">78.35<\/td>\n<td valign=\"top\">76.12<\/td>\n<td valign=\"top\">48.87<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Kolkata<\/td>\n<td valign=\"top\">83.14<\/td>\n<td valign=\"top\">79.32<\/td>\n<td valign=\"top\">78.62<\/td>\n<td valign=\"top\">74.96<\/td>\n<td valign=\"top\">68.84<\/td>\n<td valign=\"top\">51.19<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Secunderabad<\/td>\n<td valign=\"top\">81.40<\/td>\n<td valign=\"top\">79.78<\/td>\n<td valign=\"top\">78.36<\/td>\n<td valign=\"top\">74.36<\/td>\n<td valign=\"top\">74.86<\/td>\n<td valign=\"top\">52.96<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Chennai<\/td>\n<td valign=\"top\">81.10<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">74.75<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">\u2013<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Mumbai<\/td>\n<td valign=\"top\">79.14<\/td>\n<td valign=\"top\">76.97<\/td>\n<td valign=\"top\">76.32<\/td>\n<td valign=\"top\">73.33<\/td>\n<td valign=\"top\">70.00<\/td>\n<td valign=\"top\">47.97<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Ahmedabad<\/td>\n<td valign=\"top\">78.82<\/td>\n<td valign=\"top\">72.31<\/td>\n<td valign=\"top\">73.06<\/td>\n<td valign=\"top\">71.72<\/td>\n<td valign=\"top\">63.29<\/td>\n<td valign=\"top\">49.44<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bhubaneswar<\/td>\n<td valign=\"top\">78.67<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">74.50<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">58.44<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Thiruvananthapuram<\/td>\n<td valign=\"top\">77.80<\/td>\n<td valign=\"top\">75.45<\/td>\n<td valign=\"top\">72.42<\/td>\n<td valign=\"top\">66.30<\/td>\n<td valign=\"top\">60.46<\/td>\n<td valign=\"top\">55.27<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bengaluru<\/td>\n<td valign=\"top\">76.18<\/td>\n<td valign=\"top\">75.04<\/td>\n<td valign=\"top\">71.21<\/td>\n<td valign=\"top\">67.93<\/td>\n<td valign=\"top\">62.72<\/td>\n<td valign=\"top\">42.36<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Guwahati<\/td>\n<td valign=\"top\">73.42<\/td>\n<td valign=\"top\">68.52<\/td>\n<td valign=\"top\">65.63<\/td>\n<td valign=\"top\">66.23<\/td>\n<td valign=\"top\">69.56<\/td>\n<td valign=\"top\">26.62<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&#8220;\u2013&#8221; means no Station Master vacancy in that category or the figure was not published.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Station_Master_CBT_2_Cut_Off_for_CBAT_Shortlisting_%E2%80%93_Previous\"><\/span><b>RRB Station Master CBT 2 Cut Off for CBAT Shortlisting &#8211; Previous<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>After CBT 2, Station Master candidates were shortlisted for the aptitude test (CBAT) on their normalised CBT 2 marks. UR cut offs ranged from 70.94 (Guwahati) to 81.90 (Bilaspur, CR). The CBT 2 exam was held on 10 July 2026 and its cut off was released on 27 August 2026.<\/p>\n<table cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\"><strong>RRB Zone (Railway)<\/strong><\/td>\n<td valign=\"top\"><strong>UR<\/strong><\/td>\n<td valign=\"top\"><strong>OBC<\/strong><\/td>\n<td valign=\"top\"><strong>EWS<\/strong><\/td>\n<td valign=\"top\"><strong>SC<\/strong><\/td>\n<td valign=\"top\"><strong>ST<\/strong><\/td>\n<td valign=\"top\"><strong>ESM<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bilaspur (CR)<\/td>\n<td valign=\"top\">81.90<\/td>\n<td valign=\"top\">84.20<\/td>\n<td valign=\"top\">81.77<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">66.95<\/td>\n<td valign=\"top\">54.60<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Ajmer (WCR)<\/td>\n<td valign=\"top\">81.20<\/td>\n<td valign=\"top\">78.16<\/td>\n<td valign=\"top\">77.87<\/td>\n<td valign=\"top\">71.79<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">52.87<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Chennai (SR)<\/td>\n<td valign=\"top\">80.06<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">68.09<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">\u2013<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Ranchi (SER)<\/td>\n<td valign=\"top\">79.89<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">77.49<\/td>\n<td valign=\"top\">68.95<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">54.70<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Secunderabad (ECoR)<\/td>\n<td valign=\"top\">79.77<\/td>\n<td valign=\"top\">79.77<\/td>\n<td valign=\"top\">77.59<\/td>\n<td valign=\"top\">68.09<\/td>\n<td valign=\"top\">66.67<\/td>\n<td valign=\"top\">57.26<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bhopal (WR)<\/td>\n<td valign=\"top\">79.49<\/td>\n<td valign=\"top\">78.45<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">71.26<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">50.29<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Mumbai (CR)<\/td>\n<td valign=\"top\">79.20<\/td>\n<td valign=\"top\">77.30<\/td>\n<td valign=\"top\">77.30<\/td>\n<td valign=\"top\">70.37<\/td>\n<td valign=\"top\">68.39<\/td>\n<td valign=\"top\">49.00<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Mumbai (WR)<\/td>\n<td valign=\"top\">77.01<\/td>\n<td valign=\"top\">74.93<\/td>\n<td valign=\"top\">74.71<\/td>\n<td valign=\"top\">67.52<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">47.58<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Kolkata (SER)<\/td>\n<td valign=\"top\">76.64<\/td>\n<td valign=\"top\">74.93<\/td>\n<td valign=\"top\">76.35<\/td>\n<td valign=\"top\">68.66<\/td>\n<td valign=\"top\">64.37<\/td>\n<td valign=\"top\">53.28<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Kolkata (ER)<\/td>\n<td valign=\"top\">75.86<\/td>\n<td valign=\"top\">73.56<\/td>\n<td valign=\"top\">73.79<\/td>\n<td valign=\"top\">68.97<\/td>\n<td valign=\"top\">60.92<\/td>\n<td valign=\"top\">47.70<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Secunderabad (SCR)<\/td>\n<td valign=\"top\">75.78<\/td>\n<td valign=\"top\">74.07<\/td>\n<td valign=\"top\">73.28<\/td>\n<td valign=\"top\">68.66<\/td>\n<td valign=\"top\">67.52<\/td>\n<td valign=\"top\">50.14<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Thiruvananthapuram (SR)<\/td>\n<td valign=\"top\">75.50<\/td>\n<td valign=\"top\">73.22<\/td>\n<td valign=\"top\">67.82<\/td>\n<td valign=\"top\">60.40<\/td>\n<td valign=\"top\">55.56<\/td>\n<td valign=\"top\">47.86<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bilaspur (SECR)<\/td>\n<td valign=\"top\">75.29<\/td>\n<td valign=\"top\">74.14<\/td>\n<td valign=\"top\">75.78<\/td>\n<td valign=\"top\">69.23<\/td>\n<td valign=\"top\">66.10<\/td>\n<td valign=\"top\">51.28<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Malda (ER)<\/td>\n<td valign=\"top\">75.21<\/td>\n<td valign=\"top\">74.93<\/td>\n<td valign=\"top\">74.14<\/td>\n<td valign=\"top\">70.37<\/td>\n<td valign=\"top\">68.09<\/td>\n<td valign=\"top\">46.26<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bengaluru (SWR)<\/td>\n<td valign=\"top\">74.93<\/td>\n<td valign=\"top\">73.50<\/td>\n<td valign=\"top\">70.37<\/td>\n<td valign=\"top\">66.38<\/td>\n<td valign=\"top\">60.97<\/td>\n<td valign=\"top\">45.87<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Mumbai (SCR)<\/td>\n<td valign=\"top\">74.36<\/td>\n<td valign=\"top\">76.72<\/td>\n<td valign=\"top\">73.56<\/td>\n<td valign=\"top\">68.97<\/td>\n<td valign=\"top\">64.94<\/td>\n<td valign=\"top\">47.13<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Ahmedabad (WR)<\/td>\n<td valign=\"top\">74.14<\/td>\n<td valign=\"top\">66.10<\/td>\n<td valign=\"top\">68.95<\/td>\n<td valign=\"top\">63.82<\/td>\n<td valign=\"top\">55.27<\/td>\n<td valign=\"top\">48.15<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Bhubaneswar<\/td>\n<td valign=\"top\">72.93<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">70.09<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">\u2013<\/td>\n<td valign=\"top\">50.14<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Guwahati (NFR)<\/td>\n<td valign=\"top\">70.94<\/td>\n<td valign=\"top\">67.81<\/td>\n<td valign=\"top\">66.09<\/td>\n<td valign=\"top\">67.52<\/td>\n<td valign=\"top\">62.68<\/td>\n<td valign=\"top\">27.07<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>CBAT has its own qualifying standard: candidates must score at least 42 in each test battery, with no relaxation for any category. Final merit for Station Master is drawn up from CBT 2 and CBAT scores together (70% and 30% weightage respectively).<\/p>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Thiruvananthapuram_Station_Master_Cut_Off_Kerala_%E2%80%93_Previous\"><\/span><b>RRB Thiruvananthapuram Station Master Cut Off (Kerala) &#8211; Previous<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>RRB Thiruvananthapuram had 27 Station Master vacancies under CEN 06\/2025, and a UR candidate needed 77.80 in CBT 1 and 75.50 in CBT 2 to reach CBAT. Its cut offs sit in the lower half of all zones, especially for SC and ST.<\/p>\n<table cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\"><strong>Category<\/strong><\/td>\n<td valign=\"top\"><strong>CBT 1 Cut Off (out of 100)<\/strong><\/td>\n<td valign=\"top\"><strong>CBT 2 Cut Off for CBAT<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">UR<\/td>\n<td valign=\"top\">77.80<\/td>\n<td valign=\"top\">75.50<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">OBC<\/td>\n<td valign=\"top\">75.45<\/td>\n<td valign=\"top\">73.22<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">EWS<\/td>\n<td valign=\"top\">72.42<\/td>\n<td valign=\"top\">67.82<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">SC<\/td>\n<td valign=\"top\">66.30<\/td>\n<td valign=\"top\">60.40<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">ST<\/td>\n<td valign=\"top\">60.46<\/td>\n<td valign=\"top\">55.56<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">ESM<\/td>\n<td valign=\"top\">55.27<\/td>\n<td valign=\"top\">47.86<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The Thiruvananthapuram ST cut off of 60.46 was the lowest Station Master ST cut off among all zones in CBT 1.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_the_Station_Master_Cut_Off_Is_Decided\"><\/span><b>How the Station Master Cut Off Is Decided<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Station Master selection has four stages, and a separate cut off applies at each:<\/p>\n<ol>\n<li><b>CBT 1 (screening):<\/b> 100 questions in 90 minutes \u2014 General Awareness 40, Mathematics 30, Reasoning 30. Candidates are shortlisted for CBT 2 on normalised marks.<\/li>\n<li><b>CBT 2 (main exam):<\/b> 120 questions in 90 minutes \u2014 General Awareness 50, Mathematics 35, Reasoning 35. CBT 2 marks shortlist candidates for CBAT.<\/li>\n<li><b>CBAT (aptitude test):<\/b> a minimum of 42 in each test battery is required, with no category relaxation.<\/li>\n<li><b>Document verification and medical examination.<\/b><b><\/b><\/li>\n<\/ol>\n<h3><strong>The cut off at each stage depends on:<\/strong><\/h3>\n<ul>\n<li><b>Vacancies in your RRB:<\/b> fewer Station Master posts push the cut off up. Bhopal had only 6 posts and the highest UR cut off (88.22).<\/li>\n<li><b>Candidates appearing:<\/b> more applicants per post means stiffer competition.<\/li>\n<li><b>Paper difficulty and normalisation:<\/b> marks are normalised across shifts, so raw scores and cut offs are not directly comparable.<\/li>\n<li><b>Category and reservation:<\/b> each category has its own cut off.<\/li>\n<li><b>Post preference:<\/b> Station Master, as a Level 6 post, usually needs a higher score than Level 5 posts like Goods Train Manager in the same zone.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"How_to_Check_the_RRB_Station_Master_Cut_Off\"><\/span><b>How to Check the RRB Station Master Cut Off<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li>Go to the unified RRB website, <a href=\"https:\/\/rrb.indianrailways.gov.in\">rrb.indianrailways.gov.in<\/a>, and select your RRB.<\/li>\n<li>Open the NTPC Graduate (CEN 06\/2025) section.<\/li>\n<li>Click the CBT 1 or CBT 2 result and cut off notice.<\/li>\n<li>Download the PDF and find the Station Master row for your category.<\/li>\n<li>Compare your normalised marks from the scorecard with the cut off.<\/li>\n<\/ol>\n<h2><span class=\"ez-toc-section\" id=\"Is_Station_Master_Included_in_RRB_NTPC_2026\"><\/span><b>Is Station Master Included in RRB NTPC 2026?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>No. The new RRB NTPC Graduate notification, CEN 06\/2026 (applications 8 October to 6 November 2026), has 3,548 vacancies across Chief Commercial cum Ticket Supervisor, Goods Train Manager, Junior Accounts Assistant cum Typist and Senior Clerk cum Typist. Station Master and Traffic Assistant are not notified this time, so there is no CBAT either.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Station_Master_Short_Notice_Out\"><\/span><strong>RRB Station Master Short Notice Out\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The <strong>RRB Station Master Recruitment 2026 short notice<\/strong> has been released under <strong>CEN No. 08\/2026<\/strong> by the Railway Recruitment Boards (RRBs). The recruitment aims to fill approximately <strong>1,250 Station Master vacancies<\/strong> across Indian Railways. According to the indicative notice, online applications are tentatively scheduled to open on <strong>27 October 2026<\/strong> and close on <strong>25 November 2026<\/strong>. The post carries <strong>Pay Level 6<\/strong>under the 7th Central Pay Commission (CPC).<\/p>\n<p style=\"text-align: center;\"><strong><a href=\"https:\/\/entri.app\/blog\/rrb-station-master-notification\/\" target=\"_blank\" rel=\"noopener\">Click here for more details on RRB Station Master recruitment 2026<\/a><\/strong><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Safe_score_to_target_for_Station_Master\"><\/span><b>Safe score to target for Station Master<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Based on the CEN 06\/2025 cut offs, these targets give a buffer of a few marks above most zones:<\/p>\n<table cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\"><strong>Category<\/strong><\/td>\n<td valign=\"top\"><strong>Target CBT 1 Score (out of 100)<\/strong><\/td>\n<td valign=\"top\"><strong>Target CBT 2 Score (normalised, out of 100)<\/strong><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">UR<\/td>\n<td valign=\"top\">85+<\/td>\n<td valign=\"top\">80+<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">OBC<\/td>\n<td valign=\"top\">82+<\/td>\n<td valign=\"top\">78+<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">EWS<\/td>\n<td valign=\"top\">80+<\/td>\n<td valign=\"top\">77+<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">SC<\/td>\n<td valign=\"top\">76+<\/td>\n<td valign=\"top\">70+<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">ST<\/td>\n<td valign=\"top\">72+<\/td>\n<td valign=\"top\">67+<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>High-competition zones like Bhopal, Ranchi, Ajmer and Bilaspur need 2\u20134 marks more than these targets.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"RRB_Station_Master_Syllabus_2026\"><\/span><strong>RRB Station Master Syllabus 2026<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>1. Basic Science and Mathematics \u2013 30 Marks<\/strong><\/p>\n<ul>\n<li>\n<div>\n<div>\n<p>Number System, Ratio and Proportions, Averages and Percentages<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Profit, Loss and Discounts<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Time, Speed, Distance, Power and Work<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Algebra and Linear Equations<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Arithmetic Progression, LCM and HCF<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Geometry, Trigonometry, Area and Volumes<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Basic Probability and Statistics<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Units, Measurements, Mass, Weight and Density<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Work, Power, Energy and Kinetic Energy<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Friction, Speed, Velocity and Relative Velocity<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Heat and Temperature, Basic Electricity<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Levers and Simple Machines<\/p>\n<\/div>\n<\/div>\n<\/li>\n<\/ul>\n<p><strong>2. Data Analysis and Interpretation \u2013 30 Marks<\/strong><\/p>\n<ul>\n<li>\n<div>\n<div>\n<p>Multi-source Data Analysis<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Interpretation of Textual and Tabular Data<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Charts, Graphs, Scatter Plots and Pie Charts<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Statistical Curve Distribution<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Venn Diagrams<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Data Sufficiency<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Data Arrangement<\/p>\n<\/div>\n<\/div>\n<\/li>\n<\/ul>\n<p><strong>3. Logical Capability \u2013 20 Marks<\/strong><\/p>\n<ul>\n<li>\n<div>\n<div>\n<p>Binary Logic<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Syllogism<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Clocks and Calendars<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Assumptions<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Blood Relations and Family Tree<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Logic-based Puzzles<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>English Reading Comprehension<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Main Idea and Supporting Ideas<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Application, Logical Structure and Paragraph Style<\/p>\n<\/div>\n<\/div>\n<\/li>\n<\/ul>\n<p><strong>4. Mental Reasoning \u2013 20 Marks<\/strong><\/p>\n<ul>\n<li>\n<div>\n<div>\n<p>Analogy<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Series Completion<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Coding and Decoding<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Ranking Problems<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>Arrangement-based Problems<br \/>\n<h3><strong>RRB Station Master Syllabus 2026 PDF Download<\/strong><\/h3>\n<div class=\"lead-gen-block\"><a href=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2026\/10\/rrb-station-master-syllabus.pdf\" data-url=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2026\/10\/rrb-station-master-syllabus.pdf\" class=\"lead-pdf-download\" data-id=\"25559237\">\n<p style=\"text-align: center;\"><button class=\"btn btn-default\">RRB station master syllabus &#8211; free pdf<\/button><\/p>\n<\/a><\/div>\n<p><strong><a href=\"https:\/\/entri.app\/blog\/rrb-station-master-syllabus\/\" target=\"_blank\" rel=\"noopener\">Click here for more details on RRB Station Master Syllabus and Exam Pattern<\/a><\/strong><\/p>\n<div class=\"modal\" id=\"modal25559237\"><div class=\"modal-content\"><span class=\"close-button\">&times;<\/span>\n\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f25559237-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"25559237\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/blog\/wp-json\/wp\/v2\/posts\/25663719#wpcf7-f25559237-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"25559237\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.6\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f25559237-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/><input type=\"hidden\" name=\"_wpcf7cf_hidden_group_fields\" value=\"[]\" \/><input type=\"hidden\" name=\"_wpcf7cf_hidden_groups\" value=\"[]\" \/><input type=\"hidden\" name=\"_wpcf7cf_visible_groups\" value=\"[]\" \/><input type=\"hidden\" name=\"_wpcf7cf_repeaters\" value=\"[]\" \/><input type=\"hidden\" name=\"_wpcf7cf_steps\" value=\"{}\" \/><input type=\"hidden\" name=\"_wpcf7cf_options\" value=\"{&quot;form_id&quot;:25559237,&quot;conditions&quot;:[],&quot;settings&quot;:{&quot;animation&quot;:&quot;yes&quot;,&quot;animation_intime&quot;:200,&quot;animation_outtime&quot;:200,&quot;conditions_ui&quot;:&quot;normal&quot;,&quot;notice_dismissed&quot;:false,&quot;repeater_remove_button&quot;:&quot;bottom&quot;,&quot;notice_dismissed_update-cf7-5.9.8&quot;:true,&quot;notice_dismissed_update-cf7-6.1.1&quot;:true}}\" \/>\n<\/fieldset>\n<p><span class=\"wpcf7-form-control-wrap\" data-name=\"full_name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Name\" value=\"\" type=\"text\" name=\"full_name\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"phone\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone\" value=\"\" type=\"tel\" name=\"phone\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"email_id\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-text wpcf7-validates-as-email\" aria-invalid=\"false\" placeholder=\"Email\" value=\"\" type=\"email\" name=\"email_id\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"language\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" name=\"language\"><option value=\"\">Language<\/option><option value=\"Malayalam\">Malayalam<\/option><option value=\"Tamil\">Tamil<\/option><option value=\"Telugu\">Telugu<\/option><option value=\"Kannada\">Kannada<\/option><option value=\"Hindi\">Hindi<\/option><\/select><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"exam\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required course-field-select\" aria-required=\"true\" aria-invalid=\"false\" name=\"exam\"><option value=\"\">Exam Preparing<\/option><option value=\"SSC\/RRB\">SSC\/RRB<\/option><option value=\"Kerala PSC Exams\">Kerala PSC Exams<\/option><option value=\"Kerala PSC Teaching Exams\">Kerala PSC Teaching Exams<\/option><option value=\"Kerala PSC Technical Exams\">Kerala PSC Technical Exams<\/option><option value=\"UPSC\">UPSC<\/option><option value=\"College Admission(CAT\/MAT\/KMAT)\">College Admission(CAT\/MAT\/KMAT)<\/option><option value=\"GATE\">GATE<\/option><option value=\"Banking &amp; Insurance\">Banking &amp; Insurance<\/option><option value=\"NEET UG\/ IIT JE\">NEET UG\/ IIT JE<\/option><option value=\"Defence\">Defence<\/option><option value=\"Coding\">Coding<\/option><option value=\"Commerce\">Commerce<\/option><option value=\"Digital Marketing\">Digital Marketing<\/option><option value=\"Stock Market Course\">Stock Market Course<\/option><option value=\"Spoken English\/Personality Dev\">Spoken English\/Personality Dev<\/option><option value=\"Hospital Administration\">Hospital Administration<\/option><option value=\"Quantity Surveying\">Quantity Surveying<\/option><option value=\"Montessori TTC\">Montessori TTC<\/option><\/select><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"education\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Educational qualification\" value=\"\" type=\"text\" name=\"education\" \/><\/span>\n<\/p>\n<div style=\"display:none\">\n<input class=\"wpcf7-form-control wpcf7-hidden utm-so\" value=\"\" type=\"hidden\" name=\"utm_source\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden utm-medium\" value=\"\" type=\"hidden\" name=\"utm_medium\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden utm-campaign\" value=\"\" type=\"hidden\" name=\"utm_campaign\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden utm-content\" value=\"\" type=\"hidden\" name=\"utm_content\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden utm-term\" value=\"\" type=\"hidden\" name=\"utm_term\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden blog-url\" value=\"\" type=\"hidden\" name=\"blog_url\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden post-category-name\" value=\"\" type=\"hidden\" name=\"post_category_name\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden post-author-name\" value=\"\" type=\"hidden\" name=\"post_author_name\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden file-url\" value=\"\" type=\"hidden\" name=\"file_url\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden video-url\" value=\"\" type=\"hidden\" name=\"video_url\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden courseid\" value=\"\" type=\"hidden\" name=\"course_id\" \/>\n<input class=\"wpcf7-form-control wpcf7-hidden exam-name\" value=\"\" type=\"hidden\" name=\"exam_name\" \/>\n<\/div>\n<div class=\"cf7-cf-turnstile\" style=\"margin-top: 0px; margin-bottom: -15px;\"> <div id=\"cf-turnstile-cf7-503731261\" class=\"cf-turnstile\" data-sitekey=\"0x4AAAAAABVigxtkiZeGTu5L\" data-theme=\"light\" data-language=\"auto\" data-size=\"normal\" data-retry=\"auto\" data-retry-interval=\"1000\" data-refresh-expired=\"auto\" data-refresh-timeout=\"auto\" data-action=\"contact-form-7\" data-callback=\"turnstileCF7Callback\" data-appearance=\"always\"><\/div> <br class=\"cf-turnstile-br cf-turnstile-br-cf7-503731261\"> <style>#cf-turnstile-cf7-503731261 { margin-left: -15px; }<\/style> <script>document.addEventListener(\"DOMContentLoaded\",function(){document.querySelectorAll('.wpcf7-form').forEach(function(e){e.addEventListener('submit',function(){if(document.getElementById('cf-turnstile-cf7-503731261')){setTimeout(function(){turnstile.reset('#cf-turnstile-cf7-503731261');},1000)}})})});<\/script> <\/div><br\/><input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Submit\" \/>\n<\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n\n<\/div><\/div><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The RRB Station Master CBT 1 cut off for the previous cycle (CEN 06\/2025) ranged from 73.42 (Guwahati) to 88.22 (Bhopal) for the UR category, out of 100 normalised marks. In RRB Thiruvananthapuram, the Kerala zone, the UR cut off was 77.80, OBC 75.45, EWS 72.42, SC 66.30 and ST 60.46. Station Master is one [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":25663736,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[802,146],"tags":[],"class_list":["post-25663719","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles","category-rrb"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>RRB Station Master Cut Off 2026 - Previous Year Cut Off Details<\/title>\n<meta name=\"description\" content=\"Check category-wise RRB Station Master cut-off marks for CBT 1, CBT 2 &amp; CBAT test. View zone-wise previous year trends &amp; qualifying marks.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RRB Station Master Cut Off 2026 - Previous Year Cut Off Details\" \/>\n<meta property=\"og:description\" content=\"Check category-wise RRB Station Master cut-off marks for CBT 1, CBT 2 &amp; CBAT test. View zone-wise previous year trends &amp; qualifying marks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/\" \/>\n<meta property=\"og:site_name\" content=\"Entri Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/entri.me\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T04:49:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T05:00:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/entri.app\/blog\/wp-content\/uploads\/2026\/10\/rrb-station-master-cut-off.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"375\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Ansara Entri\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@entri_app\" \/>\n<meta name=\"twitter:site\" content=\"@entri_app\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ansara Entri\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/\"},\"author\":{\"name\":\"Ansara Entri\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#\\\/schema\\\/person\\\/dfcd72795c2b20b584d80992e35772cb\"},\"headline\":\"RRB Station Master Cut Off 2026 &#8211; Check Previous Year Cut Off Marks Details\",\"datePublished\":\"2026-10-23T04:49:39+00:00\",\"dateModified\":\"2026-10-23T05:00:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/\"},\"wordCount\":1316,\"publisher\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/entri.app\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rrb-station-master-cut-off.webp\",\"articleSection\":[\"Articles\",\"Railway\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/\",\"url\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/\",\"name\":\"RRB Station Master Cut Off 2026 - Previous Year Cut Off Details\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/entri.app\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rrb-station-master-cut-off.webp\",\"datePublished\":\"2026-10-23T04:49:39+00:00\",\"dateModified\":\"2026-10-23T05:00:02+00:00\",\"description\":\"Check category-wise RRB Station Master cut-off marks for CBT 1, CBT 2 & CBAT test. View zone-wise previous year trends & qualifying marks.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/#primaryimage\",\"url\":\"https:\\\/\\\/entri.app\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rrb-station-master-cut-off.webp\",\"contentUrl\":\"https:\\\/\\\/entri.app\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rrb-station-master-cut-off.webp\",\"width\":750,\"height\":375,\"caption\":\"rrb station master cut off\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/rrb-station-master-cut-off\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/entri.app\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Railway\",\"item\":\"https:\\\/\\\/entri.app\\\/blog\\\/category\\\/rrb\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"RRB Station Master Cut Off 2026 &#8211; Check Previous Year Cut Off Marks Details\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/entri.app\\\/blog\\\/\",\"name\":\"Entri Blog\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/entri.app\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#organization\",\"name\":\"Entri App\",\"url\":\"https:\\\/\\\/entri.app\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/entri.app\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/Entri-Logo-1.png\",\"contentUrl\":\"https:\\\/\\\/entri.app\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/Entri-Logo-1.png\",\"width\":989,\"height\":446,\"caption\":\"Entri App\"},\"image\":{\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/entri.me\\\/\",\"https:\\\/\\\/x.com\\\/entri_app\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/entri.app\\\/blog\\\/#\\\/schema\\\/person\\\/dfcd72795c2b20b584d80992e35772cb\",\"name\":\"Ansara Entri\",\"description\":\"Ansara Fathimath is an SEO Executive at Entri App with over 10 years of experience in SEO, content, and digital marketing. She has been working with Entri for over 8 years, managing blog content, freelance content writers, and content strategy. Her expertise includes SEO content planning, content creation, blog management, and optimization. She also has experience in social media handling, having previously managed social media activities at Entri and worked in digital marketing with another organization. Ansara holds a B.Tech in Computer Science Engineering and is passionate about creating informative, search-friendly content that helps competitive exam aspirants find reliable information and prepare effectively.\",\"url\":\"https:\\\/\\\/entri.app\\\/blog\\\/author\\\/ansara\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"RRB Station Master Cut Off 2026 - Previous Year Cut Off Details","description":"Check category-wise RRB Station Master cut-off marks for CBT 1, CBT 2 & CBAT test. View zone-wise previous year trends & qualifying marks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/","og_locale":"en_US","og_type":"article","og_title":"RRB Station Master Cut Off 2026 - Previous Year Cut Off Details","og_description":"Check category-wise RRB Station Master cut-off marks for CBT 1, CBT 2 & CBAT test. View zone-wise previous year trends & qualifying marks.","og_url":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/","og_site_name":"Entri Blog","article_publisher":"https:\/\/www.facebook.com\/entri.me\/","article_published_time":"2026-10-23T04:49:39+00:00","article_modified_time":"2026-10-23T05:00:02+00:00","og_image":[{"width":750,"height":375,"url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2026\/10\/rrb-station-master-cut-off.webp","type":"image\/webp"}],"author":"Ansara Entri","twitter_card":"summary_large_image","twitter_creator":"@entri_app","twitter_site":"@entri_app","twitter_misc":{"Written by":"Ansara Entri","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#article","isPartOf":{"@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/"},"author":{"name":"Ansara Entri","@id":"https:\/\/entri.app\/blog\/#\/schema\/person\/dfcd72795c2b20b584d80992e35772cb"},"headline":"RRB Station Master Cut Off 2026 &#8211; Check Previous Year Cut Off Marks Details","datePublished":"2026-10-23T04:49:39+00:00","dateModified":"2026-10-23T05:00:02+00:00","mainEntityOfPage":{"@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/"},"wordCount":1316,"publisher":{"@id":"https:\/\/entri.app\/blog\/#organization"},"image":{"@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#primaryimage"},"thumbnailUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2026\/10\/rrb-station-master-cut-off.webp","articleSection":["Articles","Railway"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/","url":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/","name":"RRB Station Master Cut Off 2026 - Previous Year Cut Off Details","isPartOf":{"@id":"https:\/\/entri.app\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#primaryimage"},"image":{"@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#primaryimage"},"thumbnailUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2026\/10\/rrb-station-master-cut-off.webp","datePublished":"2026-10-23T04:49:39+00:00","dateModified":"2026-10-23T05:00:02+00:00","description":"Check category-wise RRB Station Master cut-off marks for CBT 1, CBT 2 & CBAT test. View zone-wise previous year trends & qualifying marks.","breadcrumb":{"@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#primaryimage","url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2026\/10\/rrb-station-master-cut-off.webp","contentUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2026\/10\/rrb-station-master-cut-off.webp","width":750,"height":375,"caption":"rrb station master cut off"},{"@type":"BreadcrumbList","@id":"https:\/\/entri.app\/blog\/rrb-station-master-cut-off\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/entri.app\/blog\/"},{"@type":"ListItem","position":2,"name":"Railway","item":"https:\/\/entri.app\/blog\/category\/rrb\/"},{"@type":"ListItem","position":3,"name":"RRB Station Master Cut Off 2026 &#8211; Check Previous Year Cut Off Marks Details"}]},{"@type":"WebSite","@id":"https:\/\/entri.app\/blog\/#website","url":"https:\/\/entri.app\/blog\/","name":"Entri Blog","description":"","publisher":{"@id":"https:\/\/entri.app\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/entri.app\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/entri.app\/blog\/#organization","name":"Entri App","url":"https:\/\/entri.app\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png","contentUrl":"https:\/\/entri.app\/blog\/wp-content\/uploads\/2019\/10\/Entri-Logo-1.png","width":989,"height":446,"caption":"Entri App"},"image":{"@id":"https:\/\/entri.app\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/entri.me\/","https:\/\/x.com\/entri_app"]},{"@type":"Person","@id":"https:\/\/entri.app\/blog\/#\/schema\/person\/dfcd72795c2b20b584d80992e35772cb","name":"Ansara Entri","description":"Ansara Fathimath is an SEO Executive at Entri App with over 10 years of experience in SEO, content, and digital marketing. She has been working with Entri for over 8 years, managing blog content, freelance content writers, and content strategy. Her expertise includes SEO content planning, content creation, blog management, and optimization. She also has experience in social media handling, having previously managed social media activities at Entri and worked in digital marketing with another organization. Ansara holds a B.Tech in Computer Science Engineering and is passionate about creating informative, search-friendly content that helps competitive exam aspirants find reliable information and prepare effectively.","url":"https:\/\/entri.app\/blog\/author\/ansara\/"}]}},"_links":{"self":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25663719","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/comments?post=25663719"}],"version-history":[{"count":3,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25663719\/revisions"}],"predecessor-version":[{"id":25663739,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/posts\/25663719\/revisions\/25663739"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/media\/25663736"}],"wp:attachment":[{"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/media?parent=25663719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/categories?post=25663719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/entri.app\/blog\/wp-json\/wp\/v2\/tags?post=25663719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}