Civil Engineering Questions
Q. A solid construction put across the river to rise its water level and divert the water into the canal known as
View SolutionQ. During leveling if back sight is more than fore sight, then
View SolutionQ. A work costing less than Rs 20,000 is termed as
View SolutionQ. In multistoried government buildings the floor height is usuallv restricted to
View SolutionQ. When a chain is used at a temperature more than the temperature, it was calibrated the error in measured length will be
View SolutionQ. Any arbitrarily assumed level line from which vertical distances are measured is known as
View SolutionQ. Pitot tube is a device used in the flowing fluid for measuring
View SolutionQ. A man is sitting in a boat which is flowing in a pond. if the man drinks some water from the pond. the level of water In the pond will be
View SolutionQ. The only type of sleeper to be provided over a rail bridge
View SolutionQ. Coning of wheels is provided
View SolutionGet Question Bank
Strengthen Your Practice with our comprehensive question bank.