Basics of Civil Engineering Questions
Q. which one is the correct sequence for the temporary adjustment of the theodolite
View SolutionQ. Choice of type foundation depends on
View SolutionQ. Minimum grade of concrete used for RCC work is
View SolutionQ. In chain surveying, Ranging rods are used for
View SolutionQ. The purpose of level tube in the levelling instrument is
View SolutionQ. A staff reading taken on a bench mark or a point of known elevation is called
View SolutionQ. A dumpy level is set up between station A and B. Staff is held at A whose reduced level is 100.000 and staff reading is noted as 2.100 and them staff reading is noted as 1.000 after holding at B. What is the reduced level of B ?
View SolutionQ. The power of a telescope to form distinguishable images of objects separated by small angular distance is called
View SolutionQ. Segregation in concrete is termed as
View SolutionQ. Excess water in the mix comes up at the surface cause small pores through the mass of concrete.This phenomenon is termed as