Construction projects are completed by an army of subcontractors, each with their own specialised skill set. How do they choose what to work on, though? In construction, a request for information is known as an RFI. If subcontractors have any questions, this construction paper clarifies what they need to accomplish. This article will provide you with the most beneficial guidance to the construction request for information (RFI) process.
What is an RFI (request for information) in Construction?
An RFI in construction is a procedure for obtaining clarification on documentation, drawings, specifications, or other project circumstances when there are doubts or confusion regarding what to do. These information gaps or ambiguities are identified through the information request, and judgments about them are discussed and decided upon during the course of the project.
In construction, an RFI will be sent by the general contractor or the subcontractor. This is a contractual requirement as well as a procedure for issue clarification. Any mistakes, inconsistencies, or omissions found on the construction site have to be reported on the construction paperwork. This information is obtained from a design, engineering, or construction professional via a written request for information (RFI).
To complete a project on schedule, within budget, and with acceptable quality, it is essential to provide clarification on any information that was either omitted from or unclearly stated in the construction contract. Following their resolution, the general contractor and subcontractor must maintain continuous communication. Gantt charts will be used by the general contractor to develop project schedules and plans, but subcontractors will require other tools to complete their work.
Start a rewarding career in Quantity Surveying! Book for Free Demo Classes Here!
The RFI(request for information) Construction Process
1: What is the main purpose of a Bill of Quantities (BoQ)?
There are numerous ways to implement the RFI procedure. An RFI can be requested by a subcontractor from a general contractor, or it can be used by the general contractor to obtain further data from the project owner or architect. An RFI document can be used by anybody to request further details regarding a building project.
Soliciting Party Asks for More Information Using an RFI
To make any clarifications regarding the contract, design, specifications, or standards, the general contractor or subcontractor drafts the Request for Information (RFI) construction document. The party possessing the information needed to respond to the request is then sent the RFI.
The Receiving Party Reviews the RFI and Sends the Requested Information
The Request for Information has been accepted and reviewed. The RFI is sent back to the entity who requested it if it can be answered. If not, a detailed response is given to the relevant person, the client, the architect, the engineer, the consultant, or subcontractor.
Soliciting Party Evaluates the Response
After reviewing the response to their request for information, the party requesting the job proceeds with the work if no additional information is needed. If not, the procedure is repeated with the solicited party reviewing and resubmitting the RFI.
Types of RIF(request for information) Construction
RFIs for construction fall into more than a dozen main categories. Among these are the following:
Construction Coordination – Requests for organising and coordinating construction-related schedules, safety precautions, and processes fall under this category of RFI.
Design Coordination – These RFIs entail organising, communicating, and coordinating the design and supporting materials among project partners.
Coordination of Construction – Requests for organising and coordinating construction-related schedules, safety precautions, and processes fall under this category of RFIs.
Constructability Issues – The contractor raises these RFIs when a detail or design is specified in the construction document that the contractor believes is not practicable.
Timing and Phasing – RFIs of this kind are generated when labour or resource restrictions force the builder to reorganise the order in which construction tasks are completed.
Design Change – The goal of these RFIs is to make changes to the design that will make construction easier or correct a construction error.
Deleted Scope – The goal of these RFIs is to take tasks out of the project.
Plans and Specifications that aren’t Complete: This kind of RFI highlights mistakes or omissions in the plans and specifications.
Material Change – The requester of this kind of RFI aims to utilise a different material than what is specified in the construction papers.
Site Conditions – These RFIs are raised by builders who find a mismatch between the building documents’ depiction of the site’s conditions and the real site’s circumstances.
Design Change – The goal of these RFIs is to make changes to the design that will make construction easier or correct a construction error.
Design Clarification – In this type of RFI, the requester aims to gain a deeper understanding of the design’s specifics and their relationship to the project by requesting further information on the design.
Modification of Method or Process – This type of RFI is submitted when the contractor want to alter a predetermined construction or installation method.
Utility Conflict – Use this kind of RFI when development cannot move forward as originally intended due to utility lines (such as power or water pipes).
Value Engineering –This type of RFI looks for adjustments that can save costs, increase productivity, or improve quality.
Other Issues – This category includes any other possible RFI categories, including demands for penalties, non-design documentation, certificates, and inspections, as well as requests pertaining to warranties.
Why Are Construction RFI(request for information) Important?
While no one like additional paperwork, RFIs are necessary in the building process because they affect safety, quality, budget, risk, and responsibility.
RFIs assist you in properly constructing a building, completing tasks of the highest calibre, and satisfying customers. Incomplete and delayed responses to request for information (RFIs) could result in expensive reconstruction work and consequently high costs for the party at fault (contractor, architect, or owner). Paying more is never a happy thing for anyone.
Correctly writing and responding to RFIs can literally mean the difference between life and death. RFIs make ensuring that construction crews follow all safety regulations, use the right supplies, and complete the job as directed. For instance, 114 people lost their lives when a walkway inside the Hyatt Regency hotel in Kansas City collapsed in 1981. In the end, it was discovered that the poor construction was caused by a lack of communication between the steel fabricator and the architect on the assessment of design modifications.
RFIs serve as proof that project members completed their tasks appropriately. RFIs might bolster allegations of carelessness or fraud in the event of disagreements down the road. It’s crucial to handle RFIs carefully because construction litigation may be costly and time-consuming.
Where are RFIs normally used?
RFIs are useful for almost anything. More precisely, they can be granted for a variety of purposes and at every step of a building project, from design to completion. That is any circumstance in which further input or explanation is needed in order to move forward with a task. RFIs are typically utilised in the design development or material selection process to address some of the following issues:
- Building specifications and standards
- Contractual agreements
- Construction management plan
- Material management
- Drawings for building design
How to manage RFIs in Construction
Maintaining timelines and financial constraints requires you to make sure you have all the information required for each task. These six strategies will help you handle your RFIs effectively, prevent information leaks, and increase your bottom line profits.
Keep it simple and be specific
This is critical to be clear and precise when submitting an RFI. Confusion and problems might arise from having too much knowledge or asking too many questions. Send separate RFIs for any questions you may have. Having several RFIs may seem like a lot, but in the long term, it will benefit you by enabling easier tracking and clarity for every issue.
Provide visual guidance when possible
Eliminating confusion using a drawing or photo may save you money and time. You may ensure that nothing is lost in translation and provide the other person with more context by attaching an image or diagram with your request for information (RFI).
Practice open communication
To ensure that everyone is in agreement, promote candid communication. This procedure might help to prevent some future RFIs. Incorporate every stakeholder in the project. Errors and blunders become more likely when information is not communicated clearly.
Set due dates
When sending an RFI, it’s important to keep the deadline in mind. By establishing a deadline, you can keep your subcontractor or team member accountable and ensure that there are no delays. Enforcing deadlines helps you stay on schedule with your projects and jobs, which eventually results in satisfied clients.
Update your status
Updating the status is essential for managing the RFI process. Everyone is informed about the request’s progress by its current state. For instance, let’s say you’ve sent a vendor an RFI. You still haven’t heard anything after days pass. In any case, this eliminates questions and clears up any confusion within your team. They are aware that the job delay is not your fault.
Start a rewarding career in Quantity Surveying! Book for Free Demo Classes Here!
For a better understanding of RIF in Construction, see this YouTube video.
Entri App – Quantity Survey Course
Entri is a top-notch programme that provides a comprehensive and engaging online course on quantity surveying. Measurement, estimating, cost control, and contract administration are only a few of the principles, methods, and strategies covered in the course on quantity surveying. Our team of professionals offers each learner individualised instruction and assistance. Additionally, it has an easy-to-use interface that lets students access the course materials whenever and wherever it’s convenient for them. We provide courses in Tamil, Telugu, and Malayalam for quantity surveying.
Engineering Upskilling Courses
|
MEP Course |
Structural Design Course |
Conclusion
Nobody will ever work on a building project without completing an RFI. However, there may be solutions to reduce the time and effort needed for it. Of course, the idea behind any building project is to have the fewest possible RFIS. More earnings and fewer setbacks will follow from this.
However, that isn’t always feasible. Questions concerning specific project stages will arise; at this point, the various stakeholders should take the initiative to make sure that everything goes according to plan and that all queries are addressed in the allotted amount of time.
Start a rewarding career in Quantity Surveying! Book for Free Demo Classes Here!
Frequently Asked Questions
How to do RFI in construction?
Add the RFI number, title, and date to the request for information. Any attachments—plans, drawings, invoices, etc.—should be noted.
What does a typical RFI look like?
Generally speaking, your RFI ought to contain the following: an outline of the task or undertaking. Describe the overall parameters of the project and the intended results.
What are the goals of RFI?
Requests for Information (RFIs) give the government, community stakeholders, and human services providers the chance to pinpoint pertinent community issues, collaborate on solutions, and develop the most effective procurement arrangements to produce the required results.